Design considerations for construction of the Qinling Tunnel using TBM

被引:22
|
作者
Liu, P
Liang, WH
机构
关键词
Qinling Tunnel; design;
D O I
10.1016/S0886-7798(00)00041-9
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In the design of Qinling Tunnel, several problems had to be taken into account because of the use of TBM. In this paper, design issues in. the construction of Qinling Tunnel are introduced and analyzed. (C) 2000 Published by Elsevier Science Ltd. All rights reserved.
引用
收藏
页码:139 / 146
页数:8
相关论文
共 50 条
  • [1] Construction adaptability of a TBM in the Zhongtianshan tunnel
    Yu, Jie
    Modern Tunnelling Technology, 2014, 51 (03) : 57 - 60
  • [2] Second Manapouri tailrace tunnel design and construction considerations
    Heer, B
    Essex, R
    Young, D
    1997 RAPID EXCAVATION AND TUNNELING CONFERENCE, PROCEEDINGS, 1997, : 3 - 23
  • [3] Shotcrete for tunnel final linings - design and construction considerations
    Gall, V
    Zeidler, K
    Munfah, N
    Cerulli, D
    NORTH AMERICAN TUNNELING 2004, 2004, : 215 - 221
  • [4] Design summary and construction considerations for the Nagdhunga Tunnel, Nepal
    Tomita, T.
    Mitsuo, J.
    Nozue, Y.
    Asai, R.
    Shakya, N. M.
    PROCEEDINGS OF THE ITA-AITES WORLD TUNNEL CONGRESS 2023, WTC 2023: Expanding Underground-Knowledge and Passion to Make a Positive Impact on the World, 2023, : 1021 - 1029
  • [5] Design and construction of segmental lining for the double track TBM tunnel of the Athens Metro
    Lagios, P
    Papamakarios, A
    Koukoutas, S
    TUNNELS AND METROPOLISES, VOLS 1 AND 2, 1998, : 793 - 797
  • [6] Construction of water outlet tunnel using ECL and TBM for composite strata
    Ikeno, H
    Sakakibara, A
    Yasuo, T
    Makino, M
    Tokunaga, A
    TUNNELS FOR PEOPLE, VOLS 1 AND 2, 1997, : 399 - 404
  • [7] Geotechnical considerations for design and construction of an immersed tunnel - The Boston's Third Harbour Tunnel
    Chang, CC
    Narasimharajan, S
    Proceedings of the Twelfth Asian Regional Conference on Soil Mechanics and Geotechnical Engineering, Vol 1 and 2, 2003, : 851 - 854
  • [8] Lake Mead Intake No 3 Tunnel – Design considerations and construction experience
    Anagnostou G.
    Schuerch R.
    Perazzelli P.
    2018, Ernst und Sohn (11): : 15 - 23
  • [9] Construction work of Yamba tunnel TBM test section
    Takagi, K
    Tsukada, M
    Watabe, Y
    Iizuka, H
    MODERN TUNNELING SCIENCE AND TECHNOLOGY, VOLS I AND II, 2001, : 545 - 549
  • [10] Dynamic reliability evaluation of TBM components in tunnel construction
    Xiong, Yue
    Lin, Peng
    Xu, Zhenhao
    Liu, Youbo
    GEOLOGICAL JOURNAL, 2024, 59 (09) : 2594 - 2608