Research on analysis method for temperature control information of high arch dam construction

被引:2
|
作者
Zhong DengHua [1 ]
Zhao ChenSheng [1 ]
Ren BingYu [1 ]
机构
[1] Tianjin Univ, Sch Civil Engn, Dept Hydraul & Hydroelect Engn, Tianjin 300072, Peoples R China
来源
基金
中国国家自然科学基金;
关键词
high arch dam construction; temperature control information; data mining; data warehouse; neural network model;
D O I
10.1007/s11431-011-4616-5
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Temperature control, which is directly responsible for the project quality and progress, plays an important role in high arch dam construction. How to discover the rules from a large amount of temperature control information collected in order to guide the adjustment of temperature control measures to prevent cracks on site is the key scientific problem. In this paper, a mathematic logical model was built firstly by means of a coupling analysis of temperature control system decomposition and coordination for high arch dam. Then, an analysis method for temperature control information was presented based on data mining technology. Furthermore, the data warehouse of temperature control was designed, and the artificial neural network forecasting model for the highest temperature of concrete was also developed. Finally, these methods were applied to a practical project. The result showed that the efficiency and precision of temperature control was improved, and rationality and scientificity of management and decision-making were strengthened. All of these researches provided an advanced analysis method for temperature control in the high arch dam construction process.
引用
收藏
页码:40 / 46
页数:7
相关论文
共 50 条
  • [31] Real-Time Temperature Control for High Arch Dam Based on Decision Support System
    井向阳
    刘杏红
    周伟
    常晓林
    Transactions of Tianjin University, 2014, (02) : 118 - 125
  • [32] Real-time temperature control for high arch dam based on decision support system
    Jing X.
    Liu X.
    Zhou W.
    Chang X.
    Transactions of Tianjin University, 2014, 20 (02) : 118 - 125
  • [33] Real-Time Temperature Control for High Arch Dam Based on Decision Support System
    井向阳
    刘杏红
    周伟
    常晓林
    Transactions of Tianjin University, 2014, 20 (02) : 118 - 125
  • [34] Safety Analysis of Arch Dam with Strength Reverse Method
    Zhao, Xiao-lian
    Xia, Yu
    Wang, Da-wei
    Zhang, Zhong-qing
    CONSTRUCTION AND URBAN PLANNING, PTS 1-4, 2013, 671-674 : 384 - +
  • [35] Analysis and Back-Analysis for Temperature Field of Concrete Arch Dam During Construction Period Based on Temperature Data Measured by DTS
    Su, Huaizhi
    Li, Jinyou
    Hu, Jiang
    Wen, Zhiping
    IEEE SENSORS JOURNAL, 2013, 13 (05) : 1403 - 1412
  • [36] Research progress of Protected Plunge Pool of High Arch Dam
    Wang Yingkui
    Liao Renqiang
    ADVANCED CONSTRUCTION TECHNOLOGIES, 2014, 919-921 : 1244 - 1247
  • [37] Temperature control measures and feedback analysis in rapid construction of Guandi RCC dam
    Zhou, Wei
    Jing, Xiangyang
    Liu, Xinghong
    ADVANCES IN INDUSTRIAL AND CIVIL ENGINEERING, PTS 1-4, 2012, 594-597 : 1979 - 1982
  • [38] Parallel computation of seismic analysis of high arch dam
    Houqun Chen
    Huaifa Ma
    Jin Tu
    Guangqing Cheng
    Juzhen Tang
    Earthquake Engineering and Engineering Vibration, 2008, 7 : 1 - 11
  • [39] Parallel computation of seismic analysis of high arch dam
    陈厚群
    马怀发
    涂劲
    成广庆
    唐菊珍
    EarthquakeEngineeringandEngineeringVibration, 2008, (01) : 1 - 11
  • [40] Parallel computation of seismic analysis of high arch dam
    Chen Houqun
    Ma Huaifa
    Tu Jin
    Cheng Guangqing
    Tang Juzhen
    EARTHQUAKE ENGINEERING AND ENGINEERING VIBRATION, 2008, 7 (01) : 1 - 11