Research on analysis method for temperature control information of high arch dam construction

被引:2
|
作者
Zhong DengHua [1 ]
Zhao ChenSheng [1 ]
Ren BingYu [1 ]
机构
[1] Tianjin Univ, Sch Civil Engn, Dept Hydraul & Hydroelect Engn, Tianjin 300072, Peoples R China
来源
基金
中国国家自然科学基金;
关键词
high arch dam construction; temperature control information; data mining; data warehouse; neural network model;
D O I
10.1007/s11431-011-4616-5
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Temperature control, which is directly responsible for the project quality and progress, plays an important role in high arch dam construction. How to discover the rules from a large amount of temperature control information collected in order to guide the adjustment of temperature control measures to prevent cracks on site is the key scientific problem. In this paper, a mathematic logical model was built firstly by means of a coupling analysis of temperature control system decomposition and coordination for high arch dam. Then, an analysis method for temperature control information was presented based on data mining technology. Furthermore, the data warehouse of temperature control was designed, and the artificial neural network forecasting model for the highest temperature of concrete was also developed. Finally, these methods were applied to a practical project. The result showed that the efficiency and precision of temperature control was improved, and rationality and scientificity of management and decision-making were strengthened. All of these researches provided an advanced analysis method for temperature control in the high arch dam construction process.
引用
收藏
页码:40 / 46
页数:7
相关论文
共 50 条
  • [21] Research on Key Technology of Temperature Control in the Whole Process of RCC Dam Construction
    Jiang, Xiaoming
    Zhang, Lei
    Yan, Guoshun
    Liu, Yi
    Zheng, Lei
    ADVANCES IN MACHINERY, MATERIALS SCIENCE AND ENGINEERING APPLICATION, 2022, 24 : 835 - 843
  • [22] Dynamic analysis theory and practice for temperature control and cracking prevention of concrete arch dam
    Fu, Shaojun
    Zhang, Shihu
    Xie, Min
    Chen, Shenghong
    Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2012, 31 (01): : 113 - 122
  • [23] Stability analysis of the temperature cracks in Xiaowan arch dam
    Wang WeiMing
    Ding JianXin
    Wang GuoJin
    Zou LiChun
    Chen ShengHong
    SCIENCE CHINA-TECHNOLOGICAL SCIENCES, 2011, 54 (03) : 547 - 555
  • [24] Stability analysis of the temperature cracks in Xiaowan arch dam
    WANG WeiMing DING JianXin WANG GuoJin ZOU LiChun CHEN ShengHong State Key Laboratory of Water Resources and Hydropower Engineering Science Wuhan University Wuhan ChinaHydroChina Kunming Engineering Corporation Kunming China
    Science China(Technological Sciences), 2011, 54 (03) : 547 - 555
  • [25] Stability analysis of the temperature cracks in Xiaowan arch dam
    WANG WeiMing1
    2HydroChina Kunming Engineering Corporation
    Science China(Technological Sciences), 2011, (03) : 547 - 555
  • [26] Stability analysis of the temperature cracks in Xiaowan arch dam
    WeiMing Wang
    JianXin Ding
    GuoJin Wang
    LiChun Zou
    ShengHong Chen
    Science China Technological Sciences, 2011, 54 : 547 - 555
  • [27] New design method of RCC high arch dam
    Chen, QH
    ROLLER COMPACTED CONCRETE DAMS, 2003, : 427 - 430
  • [28] Study on Temperature Control Method of Yeywa Hydropower Station RCC Dam Construction
    Xia, Yuanchun
    Lin, Dongfei
    PROGRESS IN CIVIL ENGINEERING, PTS 1-4, 2012, 170-173 : 2110 - +
  • [29] Real time thermal field analysis on Wudongde super high arch dam during construction
    Haoyang Peng
    Peng Lin
    Ning Yang
    Ming Li
    Yu Qiao
    Global Energy Interconnection, 2019, 2 (03) : 264 - 269
  • [30] Numerical analysis on water temperature in reservoir for high arch dam considering the effects of sedimentation
    Liu, Xing-Hong
    Han, Yun-Tong
    Chang, Xiao-Lin
    Zhou, Wei
    Shuili Xuebao/Journal of Hydraulic Engineering, 2010, 41 (03): : 348 - 355