Research on analysis method for temperature control information of high arch dam construction

被引:2
|
作者
Zhong DengHua [1 ]
Zhao ChenSheng [1 ]
Ren BingYu [1 ]
机构
[1] Tianjin Univ, Sch Civil Engn, Dept Hydraul & Hydroelect Engn, Tianjin 300072, Peoples R China
来源
基金
中国国家自然科学基金;
关键词
high arch dam construction; temperature control information; data mining; data warehouse; neural network model;
D O I
10.1007/s11431-011-4616-5
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Temperature control, which is directly responsible for the project quality and progress, plays an important role in high arch dam construction. How to discover the rules from a large amount of temperature control information collected in order to guide the adjustment of temperature control measures to prevent cracks on site is the key scientific problem. In this paper, a mathematic logical model was built firstly by means of a coupling analysis of temperature control system decomposition and coordination for high arch dam. Then, an analysis method for temperature control information was presented based on data mining technology. Furthermore, the data warehouse of temperature control was designed, and the artificial neural network forecasting model for the highest temperature of concrete was also developed. Finally, these methods were applied to a practical project. The result showed that the efficiency and precision of temperature control was improved, and rationality and scientificity of management and decision-making were strengthened. All of these researches provided an advanced analysis method for temperature control in the high arch dam construction process.
引用
收藏
页码:40 / 46
页数:7
相关论文
共 50 条
  • [1] Research on analysis method for temperature control information of high arch dam construction
    DengHua Zhong
    ChenSheng Zhao
    BingYu Ren
    Science China Technological Sciences, 2011, 54 : 40 - 46
  • [3] Research and practice of multidimensional information model for super high arch dam construction
    Tan Y.
    Chen W.
    Lin E.
    Lin P.
    Zhou T.
    Zhou M.
    Liu C.
    Pei L.
    Liang C.
    Shang C.
    Yang P.
    Yao M.
    Li X.
    Li J.
    Qinghua Daxue Xuebao/Journal of Tsinghua University, 2022, 62 (12): : 1884 - 1895
  • [4] Temperature analysis for Lyutang RFC arch dam in construction period
    Jin F.
    Zhang G.
    Zhang Q.
    Shuili Xuebao/Journal of Hydraulic Engineering, 2020, 51 (06): : 749 - 756
  • [5] Construction Simulation and Real-Time Control for High Arch Dam
    钟登华
    任炳昱
    吴康新
    Transactions of Tianjin University, 2008, (04) : 248 - 253
  • [6] Construction simulation and real-time control for high arch dam
    Zhong D.-H.
    Ren B.-Y.
    Wu K.-X.
    Transactions of Tianjin University, 2008, 14 (04) : 248 - 253
  • [7] Research on Key Technology of Temperature Stress and Temperature Control of Arch Dam in Cold Area
    Li, Rong
    Xu, Yao
    Xia, Shifa
    Li, Xiulin
    2019 INTERNATIONAL CONFERENCE ON ADVANCES IN CIVIL ENGINEERING, ENERGY RESOURCES AND ENVIRONMENT ENGINEERING, 2019, 330
  • [8] Dynamic analysis and research on abutment stability of high arch dam
    College of Civil Engineering, Chongqing University, Chongqing 400044, China
    不详
    不详
    Yanshilixue Yu Gongcheng Xuebao, 2007, SUPPL. 1 (3421-3426):
  • [9] A web-based cooperative work system for high arch dam temperature control design, construction and management
    Li, Yangbo
    Huang, Dahai
    PROCEEDINGS OF THE 2008 12TH INTERNATIONAL CONFERENCE ON COMPUTER SUPPORTED COOPERATIVE WORK IN DESIGN, VOLS I AND II, 2008, : 925 - +
  • [10] Temperature crack control analysis for pedestal in Jinping-1 high arch dam engineering
    Qiang, Sheng
    Zhu, Yueming
    Hu, Ting
    Shao, Zhantao
    GEOTECHNICAL ENGINEERING FOR DISASTER MITIGATION AND REHABILITATION, 2008, : 735 - 741