Influence of Operation and Maintenance expenditures in the feasibility of photovoltaic projects: The case of a tracking pv plant in Spain

被引:28
|
作者
Munoz-Ceron, E. [1 ]
Lomas, J. C. [2 ]
Aguilera, J. [3 ]
de la Casa, J. [3 ]
机构
[1] Univ Jaen, IDEA Res Grp Res & Dev Solar Energy, Ctr Adv Studies Energy & Environm CEAEMA, Div Projects Engn,Dept Graph Engn Design & Projec, Jaen, Spain
[2] Gerion Ingn SL, Cl San Anton 72,5th Floor,Off 18, Granada 18005, Spain
[3] Univ Jaen, IDEA Res Grp Res & Dev Solar Energy, Ctr Adv Studies Energy & Environm CEAEMA, Elect & Automat Engn Dept, Jaen, Spain
关键词
OPEX; LCOE; Economic analysis; Grid-connected photovoltaic; Operation and Maintenance; Performance; SOLAR PV; REGULATORY FRAMEWORK; PERFORMANCE ANALYSIS; ECONOMIC-ANALYSIS; SYSTEMS; COST; PROFITABILITY; TRACKERS; POLICIES; EUROPE;
D O I
10.1016/j.enpol.2018.07.014
中图分类号
F [经济];
学科分类号
02 ;
摘要
Operation and Maintenance (O&M) tasks are becoming increasingly important in the asset management of photovoltaic projects. However, there is insufficient evidence to analyse in depth its influence on the energy and economic performance of such systems. The wide range of O&M annual expenditures (OPEX) and the lack of standardization further complicate the proliferation of specialized studies. This paper analyses the influence of OPEX on the performance and viability of a utility-scale photovoltaic tracking plant based on real data. After a description of the O&M costs incurred to maximise photovoltaic performance, a first result shows that a percentage decrease in annual OPEX does not necessarily imply the same trend in energy losses. Although this electricity decrease may jeopardise the viability of the project, the economic outlook of this study shows that high quality O&M not always improves the Levelised Cost of Electricity or the annual liquid asset of such investment. Finally, it shows real evidence of the influence of promotion policies on the viability of photovoltaic projects, taking Spain as an example, where it is more profitable to abandon the preventive maintenance of a photovoltaic plant than to invest in O&M and only undertake corrective O&M in limit situations
引用
收藏
页码:506 / 518
页数:13
相关论文
共 45 条
  • [41] Optimized seasonal performance analysis and integrated operation of 50MW floating solar photovoltaic system with Kaptai hydroelectric power plant: a case study
    Al Mehadi, Abdullah
    Nahin-Al-Khurram
    Shagor, M. Rafid Kaysar
    Sarder, M. Asif Ishrak
    ENERGY SOURCES PART A-RECOVERY UTILIZATION AND ENVIRONMENTAL EFFECTS, 2021,
  • [42] Power Gain and Daily Improvement Factor in Stand-Alone Photovoltaic Systems With Maximum Power Point Tracking Charge Regulators. Case of Study: South of Spain
    Munoz, F. J.
    Jimenez, G.
    Fuentes, M.
    Aguilar, J. D.
    JOURNAL OF SOLAR ENERGY ENGINEERING-TRANSACTIONS OF THE ASME, 2013, 135 (04):
  • [43] Forecasting Generating Power of Sun Tracking PV Plant using Long-Short Term Memory Neural Network Model: A case study in Ninh Thuan - Vietnam
    Binh Nam Nguyen
    Ogliari, Emanuele
    Pafumi, Emilio
    Alberti, Davide
    Leva, Sonia
    Minh Quan Duong
    2024 IEEE TENTH INTERNATIONAL CONFERENCE ON COMMUNICATIONS AND ELECTRONICS, ICCE 2024, 2024, : 333 - 338
  • [44] Techno-economic analysis of the feasibility of a hybrid power plant with photovoltaic panels a water treatment station and compressed air energy storage. A case study: Casablanca-Morocco
    Masaaf, Youness
    El Kadi, Youssef Ait
    Baghli, Fatima Zahra
    JOURNAL OF THERMAL ENGINEERING, 2024, 10 (06): : 1577 - 1589
  • [45] Impact of both one-and two-axis solar tracking on the techno-economic viability of on-grid PV systems: Case of the burnoye-1 power plant, Kazakhstan
    Praliyev N.
    Zhunis K.
    Kalel Y.
    Dikhanbayeva D.
    Rojas-Solórzano L.
    International Journal of Sustainable Energy Planning and Management, 2020, 29 : 79 - 90