Influence of Operation and Maintenance expenditures in the feasibility of photovoltaic projects: The case of a tracking pv plant in Spain

被引:28
|
作者
Munoz-Ceron, E. [1 ]
Lomas, J. C. [2 ]
Aguilera, J. [3 ]
de la Casa, J. [3 ]
机构
[1] Univ Jaen, IDEA Res Grp Res & Dev Solar Energy, Ctr Adv Studies Energy & Environm CEAEMA, Div Projects Engn,Dept Graph Engn Design & Projec, Jaen, Spain
[2] Gerion Ingn SL, Cl San Anton 72,5th Floor,Off 18, Granada 18005, Spain
[3] Univ Jaen, IDEA Res Grp Res & Dev Solar Energy, Ctr Adv Studies Energy & Environm CEAEMA, Elect & Automat Engn Dept, Jaen, Spain
关键词
OPEX; LCOE; Economic analysis; Grid-connected photovoltaic; Operation and Maintenance; Performance; SOLAR PV; REGULATORY FRAMEWORK; PERFORMANCE ANALYSIS; ECONOMIC-ANALYSIS; SYSTEMS; COST; PROFITABILITY; TRACKERS; POLICIES; EUROPE;
D O I
10.1016/j.enpol.2018.07.014
中图分类号
F [经济];
学科分类号
02 ;
摘要
Operation and Maintenance (O&M) tasks are becoming increasingly important in the asset management of photovoltaic projects. However, there is insufficient evidence to analyse in depth its influence on the energy and economic performance of such systems. The wide range of O&M annual expenditures (OPEX) and the lack of standardization further complicate the proliferation of specialized studies. This paper analyses the influence of OPEX on the performance and viability of a utility-scale photovoltaic tracking plant based on real data. After a description of the O&M costs incurred to maximise photovoltaic performance, a first result shows that a percentage decrease in annual OPEX does not necessarily imply the same trend in energy losses. Although this electricity decrease may jeopardise the viability of the project, the economic outlook of this study shows that high quality O&M not always improves the Levelised Cost of Electricity or the annual liquid asset of such investment. Finally, it shows real evidence of the influence of promotion policies on the viability of photovoltaic projects, taking Spain as an example, where it is more profitable to abandon the preventive maintenance of a photovoltaic plant than to invest in O&M and only undertake corrective O&M in limit situations
引用
收藏
页码:506 / 518
页数:13
相关论文
共 45 条
  • [21] Investigation of the feasibility and potential use of sun tracking solutions for concentrated photovoltaic Case study Fez Morocco
    Ourraoui, Imane
    Ahaitouf, Ali
    ENERGY REPORTS, 2022, 8 : 1412 - 1425
  • [22] Investigation of the feasibility and potential use of sun tracking solutions for concentrated photovoltaic Case study Fez Morocco
    Ourraoui, Imane
    Ahaitouf, Ali
    Energy Reports, 2022, 8 : 1412 - 1425
  • [23] Feasibility study of floating solar photovoltaic system integrated with a hydropower plant (Nyabarongo hydropower plant dam case study)
    Samvura, Jean de Dieu
    Niyonsaba, Jean d'Amour
    Bikorimana, J. M. V.
    Dusenge, Philbert
    Rwahama, Thomas
    2022 IEEE PES/IAS POWERAFRICA CONFERENCE, 2022, : 626 - 630
  • [24] Performance analysis and modelling of a 50 MW grid-connected photovoltaic plant in Spain after 12 years of operation
    Fuster-Palop, Enrique
    Vargas-Salgado, Carlos
    Carlos Ferri-Revert, Juan
    Paya, Jorge
    RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2022, 170
  • [25] Feasibility analysis of grid-connected and islanded operation of a solar PV microgrid system: A case study of Iraq
    Aziz, Ali Saleh
    Tajuddin, Mohammad Faridun Naim
    Adzman, Mohd Rafi
    Mohammed, Mohd Fayzul
    Ramli, Makbul A. M.
    ENERGY, 2020, 191
  • [26] Evaluation of the battery operation in ramp-rate control mode within a PV plant: A case study
    Pourmousavi, S. A.
    Saha, Tapan Kumar
    SOLAR ENERGY, 2018, 166 : 242 - 254
  • [27] Determining the optimal operation and maintenance contract period of PV poverty alleviation projects based on real options and cooperative game: Evidence from rural China
    Dai, Qiyao
    Ding, Liping
    Zhang, Zumeng
    Zhu, Yuxuan
    Shi, Yin
    JOURNAL OF RENEWABLE AND SUSTAINABLE ENERGY, 2023, 15 (02)
  • [28] Feasibility study of hybrid Diesel-PV power plants in the southern of Algeria: Case study on AFRA power plant
    Khelif, A.
    Talha, A.
    Belhamel, M.
    Arab, A. Hadj
    INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2012, 43 (01) : 546 - 553
  • [29] Evaluating solutions to facilitate the presence of operation and maintenance contractors in the pre-occupancy phases: a case study of road infrastructure projects
    Kordestani Ghalenoeei, Nazanin
    Saghatforoush, Ehsan
    Athari Nikooravan, Hamidreza
    Preece, Christopher
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2021, 21 (02) : 140 - 152
  • [30] Techno-economic feasibility of a photovoltaic-wind power plant construction for electric and hydrogen production: A case study
    Qolipour, Mojtaba
    Mostafaeipour, Ali
    Tousi, Omid Mohseni
    RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2017, 78 : 113 - 123