Settlement of reclaimed land for the new Hong Kong International Airport

被引:21
|
作者
Pickles, AR [1 ]
Tosen, R [1 ]
机构
[1] Airport Author, Geotech, Hong Kong, Peoples R China
关键词
geotechnical engineering; land reclamation; subsidence;
D O I
10.1680/igeng.1998.30712
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
Construction of the 938 ha reclamation for Hong Kong's new airport at Chek Lap Kok was essentially complete in July 1995. The construction of facilities on the reclamation commenced, prior to completion of the reclamation, in November 1994 and will be complete early in 1998 in time for the airport opening. Settlement of the reclamation has been ongoing during construction of these facilities and Will continue, at a reduced rate, during the operational life of the airport, This paper briefly describes the ground conditions at the site in so far as they affect settlement. Settlement predictions based on purely analytical methods using parameters derived from laboratory and in situ testing are discussed. A more reliable 'observational' prediction method which makes full use of the monitoring data is described and estimates of the residual settlement of the reclamation are given, The paper then describes the factors which result in significant variability of the settlement profile over relatively short distances and examples of this variability are given. Finally, the implications of the settlement on the design of the airport are briefly discussed.
引用
收藏
页码:191 / +
页数:31
相关论文
共 50 条
  • [31] Hong Kong airport checks in
    不详
    GROUND ENGINEERING, 1998, 31 (07): : 7 - 7
  • [32] Observation and numerical simulation of a weak waterspout at Hong Kong International Airport
    Hon, K. K.
    Tse, S. M.
    Chan, P. W.
    Li, Q. S.
    METEOROLOGICAL APPLICATIONS, 2021, 28 (01)
  • [33] Hong Kong International Airport - Part 2: transport links - Introduction
    Irwin, E
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-CIVIL ENGINEERING, 1998, 126 : 2 - 2
  • [34] Observation of sea breeze interactions at and near Hong Kong International Airport
    Lee, O
    Shun, CM
    METEOROLOGICAL APPLICATIONS, 2003, 10 (01) : 1 - 9
  • [35] Observation and numerical simulation of a dust devil at the Hong Kong International Airport
    Chan, Pak Wai
    LI, Q. S.
    METEOROLOGISCHE ZEITSCHRIFT, 2021, 30 (06) : 533 - 543
  • [36] Investigation and control of a measles outbreak at the Hong Kong International Airport, 2019
    Hong, Wong Chi
    Kwan, Chuang Shuk
    Hang, Lam Wing
    Yeung, Lam Ho
    Sum, Lam Tsz
    Raymond, Ho Lei Ming
    Hong, Leung Yiu
    Yonnie, Lam Chau Kuen
    WESTERN PACIFIC SURVEILLANCE AND RESPONSE, 2020, 11 (02)
  • [37] Observations and numerical simulations of sea breezes at Hong Kong International Airport
    Chan, P. W.
    Hon, K. K.
    WEATHER, 2023, 78 (02) : 55 - 63
  • [38] Latest Developments of Windshear Alerting Services at the Hong Kong International Airport
    Chan, P. W.
    DISASTER ADVANCES, 2010, 3 (03): : 44 - 53
  • [39] Determination of service levels for passenger orientation in Hong Kong International Airport
    Tam, ML
    Lam, WHK
    JOURNAL OF AIR TRANSPORT MANAGEMENT, 2004, 10 (03) : 181 - 189
  • [40] Prediction of Aircraft Noise Impact with Application to Hong Kong International Airport
    Wu, Chunhui
    Redonnet, Stephane
    AEROSPACE, 2021, 8 (09)