Settlement of reclaimed land for the new Hong Kong International Airport

被引:21
|
作者
Pickles, AR [1 ]
Tosen, R [1 ]
机构
[1] Airport Author, Geotech, Hong Kong, Peoples R China
关键词
geotechnical engineering; land reclamation; subsidence;
D O I
10.1680/igeng.1998.30712
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
Construction of the 938 ha reclamation for Hong Kong's new airport at Chek Lap Kok was essentially complete in July 1995. The construction of facilities on the reclamation commenced, prior to completion of the reclamation, in November 1994 and will be complete early in 1998 in time for the airport opening. Settlement of the reclamation has been ongoing during construction of these facilities and Will continue, at a reduced rate, during the operational life of the airport, This paper briefly describes the ground conditions at the site in so far as they affect settlement. Settlement predictions based on purely analytical methods using parameters derived from laboratory and in situ testing are discussed. A more reliable 'observational' prediction method which makes full use of the monitoring data is described and estimates of the residual settlement of the reclamation are given, The paper then describes the factors which result in significant variability of the settlement profile over relatively short distances and examples of this variability are given. Finally, the implications of the settlement on the design of the airport are briefly discussed.
引用
收藏
页码:191 / +
页数:31
相关论文
共 50 条
  • [1] Settlement due to diaphragm wall construction in reclaimed land in Hong Kong
    Thorley, CBB
    Forth, RA
    JOURNAL OF GEOTECHNICAL AND GEOENVIRONMENTAL ENGINEERING, 2002, 128 (06) : 473 - 478
  • [2] Construction of New Seoul International Airport on reclaimed land
    Lee, SC
    Lee, KJ
    Shin, EC
    PROCEEDINGS OF THE SIXTH (1996) INTERNATIONAL OFFSHORE AND POLAR ENGINEERING CONFERENCE, VOL I, 1996, 1996, : 415 - 419
  • [3] THE SETTLEMENT OF HONG KONG INTERNATIONAL AIRPORT BASED ON THE INTERFEROMETRIC POINT TARGET ANALYSIS
    Zhang Zeyu
    Ding, Xiao-li
    Wu, Songbo
    Kang Qi
    XXIV ISPRS CONGRESS: IMAGING TODAY, FORESEEING TOMORROW, COMMISSION III, 2022, 43-B3 : 1267 - 1272
  • [4] Hong Kong International Airport - construction
    Thomson, AI
    Oakervee, DE
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-CIVIL ENGINEERING, 1998, 126 : 35 - 54
  • [5] Hong Kong international airport railway
    Crighton, G
    Budge-Reid, A
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-CIVIL ENGINEERING, 1998, 126 : 35 - 54
  • [6] Hong Kong International Airport expansion
    Hong Kong Inst Eng Trans, 1600, 1 (26-30):
  • [8] Two decades of settlement of Hong Kong International Airport measured with multi-temporal InSAR
    Wu, Songbo
    Yang, Zefa
    Ding, Xiaoli
    Zhang, Bochen
    Zhang, Lei
    Lu, Zhong
    REMOTE SENSING OF ENVIRONMENT, 2020, 248
  • [9] HONG-KONG NEW AIRPORT
    MORTON, B
    MARINE POLLUTION BULLETIN, 1992, 24 (04) : 174 - 175
  • [10] Seismic settlement of a new reclaimed land
    Ku, CS
    Lee, DH
    Tsai, PH
    PROCEEDINGS OF THE FIFTEENTH (2005) INTERNATIONAL OFFSHORE AND POLAR ENGINEERING CONFERENCE, VOL 2, 2005, : 742 - 745