Two-stage stochastic master production scheduling under demand uncertainty in a rolling planning environment

被引:23
|
作者
Englberger, Julian [1 ]
Herrmann, Frank [1 ]
Manitz, Michael [2 ]
机构
[1] OTH Regensburg, Innovat & Competence Ctr Prod Logist & Factory Pl, Regensburg, Germany
[2] Univ Duisburg Essen, Mercator Sch Management, Duisburg, Germany
关键词
Master production scheduling; demand uncertainty; two-stage stochastic programming; scenario-based stochastic programming with recourse; hierarchical production planning; ROBUST OPTIMIZATION MODEL; SIMULATION;
D O I
10.1080/00207543.2016.1162917
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper proposes a scenario-based two-stage stochastic programming model with recourse for master production scheduling under demand uncertainty. We integrate the model into a hierarchical production planning and control system that is common in industrial practice. To reduce the problem of the disaggregation of the master production schedule, we use a relatively low aggregation level (compared to other work on stochastic programming for production planning). Consequently, we must consider many more scenarios to model demand uncertainty. Additionally, we modify standard modelling approaches for stochastic programming because they lead to the occurrence of many infeasible problems due to rolling planning horizons and interdependencies between master production scheduling and successive planning levels. To evaluate the performance of the proposed models, we generate a customer order arrival process, execute production planning in a rolling horizon environment and simulate the realisation of the planning results. In our experiments, the tardiness of customer orders can be nearly eliminated by the use of the proposed stochastic programming model at the cost of increasing inventory levels and using additional capacity.
引用
收藏
页码:6192 / 6215
页数:24
相关论文
共 50 条
  • [21] Chemical production planning and scheduling integration under demand uncertainty
    Tian, Ye
    Dong, Hongguang
    Zou, Xiong
    Li, Shuangshuang
    Wang, Bing
    Huagong Xuebao/CIESC Journal, 2014, 65 (09): : 3552 - 3558
  • [22] A master production scheduling procedure for stochastic demand
    Vargas, V
    Metters, R
    DECISION SCIENCES INSTITUTE, 1997 ANNUAL MEETING, PROCEEDINGS, VOLS 1-3, 1997, : 1239 - 1241
  • [23] A two-stage stochastic programming model for periodic replenishment control system under demand uncertainty
    Cunha, P. S. A.
    Raupp, F. M. P.
    Oliveira, F.
    COMPUTERS & INDUSTRIAL ENGINEERING, 2017, 107 : 313 - 326
  • [24] A two-stage modeling arid solution framework for multisite midterm planning under demand uncertainty
    Gupta, A
    Maranas, CD
    INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2000, 39 (10) : 3799 - 3813
  • [25] A Two-Stage Planning Model for Power Scheduling in a Hydro-Thermal System Under Uncertainty
    Nuernberg, Robert
    Roemisch, Werner
    OPTIMIZATION AND ENGINEERING, 2002, 3 (04) : 355 - 378
  • [26] A Two-Stage Planning Model for Power Scheduling in a Hydro-Thermal System Under Uncertainty
    Robert Nürnberg
    Werner Römisch
    Optimization and Engineering, 2002, 3 : 355 - 378
  • [27] Multi-Stage Stochastic Electrification Planning under Demand Uncertainty
    Chen, Yuang
    Basciftci, Beste
    Thomas, Valerie M.
    2022 IEEE PES/IAS POWERAFRICA CONFERENCE, 2022, : 85 - 89
  • [28] Airfreight forwarder's shipment planning under uncertainty: A two-stage stochastic programming approach
    Hui, Yer Van
    Gao, Jia
    Leung, Lawrence
    Wallace, Stein
    TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2014, 66 : 83 - 102
  • [29] Integrated optimization for production planning and scheduling in a two-stage production system
    An, Yu-Wei
    Yan, Hong-Sen
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2012, 18 (04): : 796 - 806
  • [30] Commitment under uncertainty: Two-stage stochastic matching problems
    Katriel, Irit
    Kenyon-Mathieu, Claire
    Upfal, Eli
    THEORETICAL COMPUTER SCIENCE, 2008, 408 (2-3) : 213 - 223