HASS Development method: Screen development, change schedule, and re-prove schedule

被引:3
|
作者
Silverman, M [1 ]
机构
[1] QualMark Corp, Santa Clara, CA 95050 USA
关键词
Highly Accelerated Life Test (HALT); Highly Accelerated Stress Screen (HASS); HASS Development; Highly Accelerated Stress Audit (HASA); Failure Modes and Effects Analysis (FMEA);
D O I
10.1109/RAMS.2000.816315
中图分类号
TP31 [计算机软件];
学科分类号
081202 ; 0835 ;
摘要
HALT and HASS are two very powerful tools that can help manufacturers achieve high reliability quickly both in the design phase and in the manufacturing phase. HALT is used in the design phase to help reduce the number of design-related problems. HASS is used in the production phase to help reduce the number of infant mortality types of failures. HALT is always performed prior to developing a HASS profile because the HASS profile uses the information from HALT when choosing the profile parameters. Screens for HASS are always developed using a HASS Development process. The goal of HASS Development is to provide the most effective and quickest screen possible The effectiveness of the screen is measured in its ability to find defects in the product without removing significant life. This paper describes different methods of developing a screen using the HASS Development methodology and gives guidelines on when to change a screen and when it is necessary to re-submit a product through the HASS Development process in order to reprove a screen.
引用
收藏
页码:245 / 247
页数:3
相关论文
共 50 条
  • [1] Development of the crystallization schedule for pyrocerams by the acoustic emission method
    Min'ko, NI
    Pavlenko, ZV
    Mikhal'chuk, IN
    GLASS AND CERAMICS, 1997, 54 (9-10) : 301 - 303
  • [2] Development of the crystallization schedule for pyrocerams by the acoustic emission method
    N. I. Min'ko
    Z. V. Pavlenko
    I. N. Mikhal'chuk
    Glass and Ceramics, 1997, 54 : 301 - 303
  • [3] A CLINICAL SCHEDULE OF SPEECH DEVELOPMENT
    BRUNO, G
    MONINI, S
    FOLIA PHONIATRICA, 1983, 35 (3-4): : 112 - 113
  • [4] CENTRIFUGE DEVELOPMENT IN JAPAN IS STILL ON SCHEDULE
    IMAI, R
    NUCLEAR ENGINEERING INTERNATIONAL, 1976, 21 (250): : 55 - 56
  • [5] Integrated Robust Airline Schedule Development
    Cadarso, Luis
    Marin, Angel
    STATE OF THE ART IN THE EUROPEAN QUANTITATIVE ORIENTED TRANSPORTATION AND LOGISTICS RESEARCH, 2011: 14TH EURO WORKING GROUP ON TRANSPORTATION & 26TH MINI EURO CONFERENCE & 1ST EUROPEAN SCIENTIFIC CONFERENCE ON AIR TRANSPORT, 2011, 20
  • [6] SCHEDULE DEVELOPMENT UNDER STOCHASTIC SCHEDULING
    CRANDALL, KC
    WOOLERY, JC
    JOURNAL OF THE CONSTRUCTION DIVISION-ASCE, 1982, 108 (02): : 321 - 329
  • [7] DEVELOPMENT OF A MULTIPLE SCHEDULE BASELINE TECHNIQUE
    CROWELL, FA
    SCHULTZ, CB
    KOGAN, WS
    PSYCHOLOGICAL REPORTS, 1962, 11 (02) : 335 - 340
  • [8] IDECM development schedule slips further
    Klass, PJ
    AVIATION WEEK & SPACE TECHNOLOGY, 1999, 150 (20): : 74 - 75
  • [9] Optimal schedule and effort considering the penalty cost of schedule delay in software development
    Jung, HW
    Ahn, YW
    Kim, GJ
    INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE, 2000, 31 (01) : 91 - 95
  • [10] AHEAD OF SCHEDULE DEVELOPMENT OF NEW WELLS
    DAVLETSHIN, FK
    GAZIZOV, D
    NEFTYANOE KHOZYAISTVO, 1984, (01): : 3 - 5