Highly Accelerated Life Test (HALT); Highly Accelerated Stress Screen (HASS); HASS Development; Highly Accelerated Stress Audit (HASA); Failure Modes and Effects Analysis (FMEA);
D O I
10.1109/RAMS.2000.816315
中图分类号
TP31 [计算机软件];
学科分类号
081202 ; 0835 ;
摘要
HALT and HASS are two very powerful tools that can help manufacturers achieve high reliability quickly both in the design phase and in the manufacturing phase. HALT is used in the design phase to help reduce the number of design-related problems. HASS is used in the production phase to help reduce the number of infant mortality types of failures. HALT is always performed prior to developing a HASS profile because the HASS profile uses the information from HALT when choosing the profile parameters. Screens for HASS are always developed using a HASS Development process. The goal of HASS Development is to provide the most effective and quickest screen possible The effectiveness of the screen is measured in its ability to find defects in the product without removing significant life. This paper describes different methods of developing a screen using the HASS Development methodology and gives guidelines on when to change a screen and when it is necessary to re-submit a product through the HASS Development process in order to reprove a screen.
引用
收藏
页码:245 / 247
页数:3
相关论文
共 50 条
  • [41] On the Schedule for Morphological Development of Evolved Modular Soft Robots
    Nadizar, Giorgia
    Medvet, Eric
    Miras, Karine
    GENETIC PROGRAMMING (EUROGP 2022), 2022, : 146 - 161
  • [42] Development of Methods for Project Schedule Delay Risk Analysis
    Takatsuka, Kayoko
    Sato, Tomoichi
    Aburada, Kentaro
    Okazaki, Naonobu
    KAGAKU KOGAKU RONBUNSHU, 2023, 49 (06) : 159 - 165
  • [43] An approach to schedule estimation and tracking for rapid development projects
    Lovrek, I
    Sinkovic, V
    Grahovac, D
    Caric, A
    24TH EUROMICRO CONFERENCE - PROCEEDING, VOLS 1 AND 2, 1998, : 816 - 823
  • [44] MEASUREMENT AND DEVELOPMENT OF SCHEDULE-INDUCED DRINKING IN PIGEONS
    MAGYAR, RL
    MALAGODI, EF
    PHYSIOLOGY & BEHAVIOR, 1980, 25 (02) : 245 - 251
  • [46] THE DIAGNOSTIC INTERVIEW SCHEDULE - ITS DEVELOPMENT, EVOLUTION, AND USE
    HELZER, JE
    ROBINS, LN
    SOCIAL PSYCHIATRY AND PSYCHIATRIC EPIDEMIOLOGY, 1988, 23 (01) : 6 - 16
  • [47] DEVELOPMENT OF A COMMERCIAL PRICE SCHEDULE FOR PRODUCERS AND PROCESSORS OF LAMBS
    HOPKINS, DL
    AUSTRALIAN JOURNAL OF EXPERIMENTAL AGRICULTURE, 1989, 29 (01): : 23 - 27
  • [48] Schedule Instability in Automotive Production Networks: The Development of a network-oriented Resequencing Method
    Moetz, A.
    Stylos-Duesmann, P.
    Otto, B.
    IFAC PAPERSONLINE, 2019, 52 (13): : 2810 - 2815
  • [49] METHOD DEVELOPMENT FOR THE CALCULATION OF THE METAL DRAWING PASSES SCHEDULE TO WHICH THE HOLLOMON CURVE APPLIES
    Jokovic, Zivko
    Djapic, Nina
    UNIVERSITY POLITEHNICA OF BUCHAREST SCIENTIFIC BULLETIN SERIES B-CHEMISTRY AND MATERIALS SCIENCE, 2013, 75 (03): : 165 - 174
  • [50] The Relationship of Technology and Design Maturity to DoD Weapon System Cost Change and Schedule Change During Engineering and Manufacturing Development
    Katz, Daniel R.
    Sarkani, Shahram
    Mazzuchi, Thomas
    Conrow, Edmund H.
    SYSTEMS ENGINEERING, 2015, 18 (01) : 1 - 15