HASS Development method: Screen development, change schedule, and re-prove schedule

被引:3
|
作者
Silverman, M [1 ]
机构
[1] QualMark Corp, Santa Clara, CA 95050 USA
关键词
Highly Accelerated Life Test (HALT); Highly Accelerated Stress Screen (HASS); HASS Development; Highly Accelerated Stress Audit (HASA); Failure Modes and Effects Analysis (FMEA);
D O I
10.1109/RAMS.2000.816315
中图分类号
TP31 [计算机软件];
学科分类号
081202 ; 0835 ;
摘要
HALT and HASS are two very powerful tools that can help manufacturers achieve high reliability quickly both in the design phase and in the manufacturing phase. HALT is used in the design phase to help reduce the number of design-related problems. HASS is used in the production phase to help reduce the number of infant mortality types of failures. HALT is always performed prior to developing a HASS profile because the HASS profile uses the information from HALT when choosing the profile parameters. Screens for HASS are always developed using a HASS Development process. The goal of HASS Development is to provide the most effective and quickest screen possible The effectiveness of the screen is measured in its ability to find defects in the product without removing significant life. This paper describes different methods of developing a screen using the HASS Development methodology and gives guidelines on when to change a screen and when it is necessary to re-submit a product through the HASS Development process in order to reprove a screen.
引用
收藏
页码:245 / 247
页数:3
相关论文
共 50 条
  • [31] The development and utilisation of a suicide risk assessment interview schedule
    Bantjes, Jason
    van Ommen, Clifford
    SOUTH AFRICAN JOURNAL OF PSYCHOLOGY, 2008, 38 (02) : 391 - 411
  • [32] Utilization of load data for generator voltage schedule development
    Hsu, SM
    2002 IEEE POWER ENGINEERING SOCIETY SUMMER MEETING, VOLS 1-3, CONFERENCE PROCEEDINGS, 2002, : 530 - 534
  • [33] Development of the Chinese version of the geriatric mental state schedule
    Tsang, HY
    Chong, MY
    Cheng, ATA
    INTERNATIONAL PSYCHOGERIATRICS, 2002, 14 (02) : 219 - 226
  • [34] Development of a model for Urban Rail Transit Construction Schedule
    Guo, Yanyong
    Wu, Yao
    Yu, Yao
    Xu, Xin
    SUSTAINABLE CITIES DEVELOPMENT AND ENVIRONMENT PROTECTION, PTS 1-3, 2013, 361-363 : 2075 - 2078
  • [35] Analysis of cost and schedule performance of international development projects
    Ahsan, Kamrul
    Gunawan, Indra
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2010, 28 (01) : 68 - 78
  • [36] Pneumococcal conjugate vaccines: choice of schedule and product development
    Lee, Jin
    CLINICAL AND EXPERIMENTAL PEDIATRICS, 2020, 63 (07) : 259 - 260
  • [37] A schedule of gross motor development for children with Down syndrome
    Winders, P.
    Wolter-Warmerdam, K.
    Hickey, F.
    JOURNAL OF INTELLECTUAL DISABILITY RESEARCH, 2019, 63 (04) : 346 - 356
  • [38] DEVELOPMENT AND INTRODUCTION OF A SYSTEM OF SCHEDULE PLANNING AT DZERZHINSKII WORKS
    BOLISLAV.AI
    BOSENOK, NV
    KISELEV, YV
    STAL IN ENGLISH-USSR, 1968, (11): : 968 - &
  • [39] Development and Psychometric Properties of the Mental Health Knowledge Schedule
    Evans-Lacko, Sara
    Little, Kirsty
    Meltzer, Howard
    Rose, Diana
    Rhydderch, Danielle
    Henderson, Claire
    Thornicroft, Graham
    CANADIAN JOURNAL OF PSYCHIATRY-REVUE CANADIENNE DE PSYCHIATRIE, 2010, 55 (07): : 440 - 448
  • [40] DEVELOPMENT OF A SCHEDULE FOR MEASURING SOCIAL BACKGROUND IN AFRICAN CULTURES
    BINITIE, A
    BAGLEY, C
    SOCIAL SCIENCE & MEDICINE, 1971, 5 (03) : 257 - &