A due-window determination in minmax scheduling problems

被引:0
|
作者
Mosheiov, G [1 ]
机构
[1] Hebrew Univ Jerusalem, Sch Business Adm, IL-91905 Jerusalem, Israel
关键词
deterministic scheduling; due-window; heuristics;
D O I
10.1080/03155986.2001.11732429
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In several recent scheduling studies the notion of due-date is generalized: it is assumed that jobs completed within a certain time interval (rather than at a time point) are considered as being on time, whereas jobs completed outside this interval are penalized. We study a scheduling problem on parallel identical machines, in which the schedule as well as the common due-window are to be determined. The relevant cost components are: maximum earliness, maximum tardiness, due-window starting time and due-window length. The objective is of a minmax type, i.e. we look for the schedule and due-window with minimum cost of the worst scheduled job, with respect to all cost components. We solve the problem to optimality on a single machine, and we introduce an efficient land asymptotically optimal) heuristic algorithm and a simple lower bound for the general multi-machine case. An extension to non-linear cost functions as well as the special case of unit processing times are also studied. We conclude with an extensive numerical study which indicates that both the heuristic and the lower bound produce very close-to-optimal results under various job and machine environments.
引用
收藏
页码:107 / 123
页数:17
相关论文
共 50 条
  • [41] A note on scheduling a maintenance activity and due-window assignment based on common flow allowance
    Chen, Ke
    Ji, Min
    Ge, Jiaojiao
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2013, 145 (02) : 645 - 646
  • [42] Minmax scheduling problems with common due-date and completion time penalty
    Mor, Baruch
    JOURNAL OF COMBINATORIAL OPTIMIZATION, 2019, 38 (01) : 50 - 71
  • [43] DUE-WINDOW ASSIGNMENT SCHEDULING WITH JOB-REJECTION, TRUNCATED LEARNING EFFECTS AND SETUP TIMES
    Liu, Weiguo
    Wang, Xuyin
    Li, Lu
    Dai, Weizhe
    JOURNAL OF INDUSTRIAL AND MANAGEMENT OPTIMIZATION, 2024, 20 (01) : 313 - 324
  • [44] Minmax scheduling problems with common due-date and completion time penalty
    Baruch Mor
    Journal of Combinatorial Optimization, 2019, 38 : 50 - 71
  • [45] SCHEDULING PROBLEMS WITH A COMMON DUE WINDOW ASSIGNMENT: A SURVEY
    Janiak, Adam
    Kwiatkowski, Tomasz
    Lichtenstein, Maciej
    INTERNATIONAL JOURNAL OF APPLIED MATHEMATICS AND COMPUTER SCIENCE, 2013, 23 (01) : 231 - 241
  • [46] A note on parallel-machine due-window assignment
    Xu, D.
    Li, C-L
    Han, Q.
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2012, 63 (06) : 821 - 825
  • [47] Due-Window Assignment and Resource Allocation Scheduling with Truncated Learning Effect and Position-Dependent Weights
    Lin, Shan-Shan
    DISCRETE DYNAMICS IN NATURE AND SOCIETY, 2020, 2020
  • [48] Study on Single-Machine Group Scheduling with Due-Window Assignment and Position-Dependent Weights
    Liu, Weiguo
    Wang, Xuyin
    Wang, Xiaoxiao
    Zhao, Peizhen
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2021, 2021
  • [49] BICRITERIA DUE-WINDOW ASSIGNMENT AND RESOURCEALLOCATION SCHEDULING WITH AGING EFFECTAND A DETERIORATING RATE-MODIFYING ACTIVITY
    Zhao, Xiaoli
    INTERNATIONAL JOURNAL OF INNOVATIVE COMPUTING INFORMATION AND CONTROL, 2024, 20 (04): : 1169 - 1183
  • [50] A note to due-window assignment and single machine scheduling with deteriorating jobs and a rate-modifying activity
    Zhao, Chuanli
    Tang, Hengyong
    COMPUTERS & OPERATIONS RESEARCH, 2012, 39 (06) : 1300 - 1303