A due-window determination in minmax scheduling problems

被引:0
|
作者
Mosheiov, G [1 ]
机构
[1] Hebrew Univ Jerusalem, Sch Business Adm, IL-91905 Jerusalem, Israel
关键词
deterministic scheduling; due-window; heuristics;
D O I
10.1080/03155986.2001.11732429
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In several recent scheduling studies the notion of due-date is generalized: it is assumed that jobs completed within a certain time interval (rather than at a time point) are considered as being on time, whereas jobs completed outside this interval are penalized. We study a scheduling problem on parallel identical machines, in which the schedule as well as the common due-window are to be determined. The relevant cost components are: maximum earliness, maximum tardiness, due-window starting time and due-window length. The objective is of a minmax type, i.e. we look for the schedule and due-window with minimum cost of the worst scheduled job, with respect to all cost components. We solve the problem to optimality on a single machine, and we introduce an efficient land asymptotically optimal) heuristic algorithm and a simple lower bound for the general multi-machine case. An extension to non-linear cost functions as well as the special case of unit processing times are also studied. We conclude with an extensive numerical study which indicates that both the heuristic and the lower bound produce very close-to-optimal results under various job and machine environments.
引用
收藏
页码:107 / 123
页数:17
相关论文
共 50 条
  • [21] Scheduling a maintenance activity and due-window assignment on a single machine
    Mosheiov, Gur
    Sarig, Assaf
    COMPUTERS & OPERATIONS RESEARCH, 2009, 36 (09) : 2541 - 2545
  • [22] Approaches to Solving Scheduling with Due-Window Assignment and Deterioration Effects
    Teng, Fei
    Luo, Si-Wen
    Lv, Dan-Yang
    Wang, Ji-Bo
    ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2023, 40 (02)
  • [23] Due-window assignment scheduling in the proportionate flow shop setting
    Xinyu Sun
    Xin-Na Geng
    Tao Liu
    Annals of Operations Research, 2020, 292 : 113 - 131
  • [24] A multi-criteria scheduling with due-window assignment problem
    Mosheiov, Gur
    Sarig, Assaf
    MATHEMATICAL AND COMPUTER MODELLING, 2008, 48 (5-6) : 898 - 907
  • [25] Optimization for Due-Window Assignment Scheduling with Position-Dependent Weights
    Wang, Li-Yan
    Lv, Dan-Yang
    Zhang, Bo
    Liu, Wei-Wei
    Wang, Ji-Bo
    DISCRETE DYNAMICS IN NATURE AND SOCIETY, 2020, 2020
  • [26] Study on due-window assignment scheduling based on common flow allowance
    Wu, Yu-Bin
    Wan, Long
    Wang, Xiao-Yuan
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2015, 165 : 155 - 157
  • [27] Improved algorithms for proportionate flow shop scheduling with due-window assignment
    Qian, Jin
    Han, Haiyan
    ANNALS OF OPERATIONS RESEARCH, 2022, 309 (01) : 249 - 258
  • [28] Improved algorithms for proportionate flow shop scheduling with due-window assignment
    Jin Qian
    Haiyan Han
    Annals of Operations Research, 2022, 309 : 249 - 258
  • [29] Due-window assignment problems with unit-time jobs
    Gerstl, Enrique
    Mosheiov, Gur
    APPLIED MATHEMATICS AND COMPUTATION, 2013, 220 : 487 - 495
  • [30] Due-window assignment scheduling with past-sequence-dependent setup times
    Liu, Weiguo
    Wang, Xuyin
    Wang, Xiaoxiao
    Zhao, Peizhen
    MATHEMATICAL BIOSCIENCES AND ENGINEERING, 2022, 19 (03) : 3110 - 3126