Nominal installed capacity utilization factor (ICUF) as an indicator of the installed capacity utilization efficiency of a nuclear power plant

被引:0
|
作者
Sigal, EM
机构
[1] All-Russia Scientific-Research Institute of Nuclear Power Plants,
关键词
Russia; Power Plant; Power System; Nuclear Power Plant; Utilization Efficiency;
D O I
10.1023/A:1023631702553
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
The nominal installed capacity utilization factor for power-generating units in different types of nuclear power plants is analyzed. It is shown that this indicator does not correlate with the operative regulation for servicing power-generating units, and it does not take into account the probability of unanticipated power decreases due to equipment failures and the present operating conditions of nuclear power plants in the common power system operating in Russia.
引用
收藏
页码:71 / 75
页数:5
相关论文
共 50 条
  • [31] Study of a grid-connected floating photovoltaic power plant of 1.0 MW installed capacity in Saudi Arabia
    Saeed, Ahmed
    Rehman, Shafiqur
    Al-Sulaiman, Fahad A.
    HELIYON, 2024, 10 (16)
  • [32] The Research of Mini-Hydro Power Plants Quantity and Installed Capacity in Russia
    Egorov, Alexandr O.
    Kulikova, Valentina S.
    Petrushin, Denis E.
    Sadokhina, Mariya A.
    PROCEEDINGS OF THE 2021 IEEE CONFERENCE OF RUSSIAN YOUNG RESEARCHERS IN ELECTRICAL AND ELECTRONIC ENGINEERING (ELCONRUS), 2021, : 1405 - 1408
  • [33] Optimal Installed Capacity of Renewable Energy Sources for Active Power Shortage Minimization
    Aljendy, Raseel, I
    Nasyrov, R. R.
    Tulsky, V. N.
    Sultan, Hamdy M.
    2019 INTERNATIONAL URAL CONFERENCE ON ELECTRICAL POWER ENGINEERING (URALCON), 2019, : 349 - 354
  • [34] The Malmquist productivity index and plant capacity utilization
    De Borger, B
    Kerstens, K
    SCANDINAVIAN JOURNAL OF ECONOMICS, 2000, 102 (02): : 303 - 310
  • [35] Installed Hydropower Capacity and Carbon Emission Reduction Efficiency Based on the EBM Method in China
    Liang, Dong
    Tian, Ze
    Ren, Fangrong
    Pan, Jingjing
    FRONTIERS IN ENERGY RESEARCH, 2020, 8
  • [36] Erosion behaviour of turbine rotor blades installed in the Krsko nuclear power plant
    Stanisa, B
    Schauperl, Z
    Grilec, K
    WEAR, 2003, 254 (7-8) : 735 - 741
  • [37] Static efficiency decompositions and capacity utilization: integrating economic and technical capacity notions
    De Borger, Bruno
    Kerstens, Kristiaan
    Prior, Diego
    Van de Woestyne, Ignace
    APPLIED ECONOMICS, 2012, 44 (31) : 4125 - 4141
  • [38] Analysis of the maximum installed capacity of PV station constrained by power system security and stability
    Wang, Yibo
    Li, Jing
    Xu, Honghua
    Taiyangneng Xuebao/Acta Energiae Solaris Sinica, 2008, 29 (08): : 971 - 975
  • [39] Installed Capacity Prediction of Biomass Power Generation in China based on Gray Dynamic Model
    Liu, Zhibin
    Ren, Aisheng
    Hou, Liwei
    ADVANCES IN ENERGY SCIENCE AND TECHNOLOGY, PTS 1-4, 2013, 291-294 : 221 - 224
  • [40] Determination of Installed Capacity of Pumped Storage Station in WSP Hybrid Power Supply System
    Chen, G. Z.
    Liu, D. Y.
    Wang, F.
    Ou, C. Q.
    2009 INTERNATIONAL CONFERENCE ON SUSTAINABLE POWER GENERATION AND SUPPLY, VOLS 1-4, 2009, : 1772 - 1776