Nominal installed capacity utilization factor (ICUF) as an indicator of the installed capacity utilization efficiency of a nuclear power plant

被引:0
|
作者
Sigal, EM
机构
[1] All-Russia Scientific-Research Institute of Nuclear Power Plants,
关键词
Russia; Power Plant; Power System; Nuclear Power Plant; Utilization Efficiency;
D O I
10.1023/A:1023631702553
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
The nominal installed capacity utilization factor for power-generating units in different types of nuclear power plants is analyzed. It is shown that this indicator does not correlate with the operative regulation for servicing power-generating units, and it does not take into account the probability of unanticipated power decreases due to equipment failures and the present operating conditions of nuclear power plants in the common power system operating in Russia.
引用
收藏
页码:71 / 75
页数:5
相关论文
共 50 条
  • [21] Design of a Throttled Surge Tank for Refurbishment by Increase of Installed Capacity at a High-Head Power Plant
    Adam, N. J.
    De Cesare, G.
    Nicolet, C.
    Billeter, P.
    Angermayr, A.
    Valluy, B.
    Schleiss, A. J.
    JOURNAL OF HYDRAULIC ENGINEERING, 2018, 144 (02)
  • [22] Analyzing the Efficiency of Using an Installed Refrigeration Capacity of Ambient Air Conditioning System
    Radchenko, Andrii
    Forduy, Serhiy
    Kantor, Serhiy
    Tkachenko, Veniamin
    Tsaran, Felix
    INTEGRATED COMPUTER TECHNOLOGIES IN MECHANICAL ENGINEERING - 2021, 2022, 367 : 520 - 531
  • [23] Examining the Effects of Installed Capacity Mix and Capacity Factor on Aggregate Carbon Intensity for Electricity Generation in China
    Ma, Shiping
    Liu, Qianqian
    Zhang, Wenzhong
    INTERNATIONAL JOURNAL OF ENVIRONMENTAL RESEARCH AND PUBLIC HEALTH, 2022, 19 (06)
  • [24] India: Planning to increase installed nuclear capacity by 15,700 MW
    不详
    ATW-INTERNATIONAL JOURNAL FOR NUCLEAR POWER, 2018, 63 (10): : 554 - 554
  • [25] Beating US$10 per pound of installed capacity for a laterite nickel plant
    Dolan, DS
    Nendick, RM
    INTERNATIONAL LATERITE NICKEL SYMPOSIUM-2004, 2004, : 55 - 62
  • [26] Increasing the rated capacity of power units installed at Russian nuclear power stations equipped with VVER-1000 reactors
    Ignatov V.I.
    Shutikov A.V.
    Ryzhkov Yu.A.
    Kop'Ev Yu.V.
    Ryzhov S.B.
    Berkovich V.Ya.
    Semchenkov Yu.M.
    Aminov R.Z.
    Khrustalev V.A.
    Thermal Engineering, 2009, 56 (11) : 963 - 966
  • [27] Optimal Configuration Method for the Installed Capacity of the Solar-Thermal Power Stations
    Wang Y.
    Ma Z.
    Zhang J.
    Zhou Q.
    Zhang R.
    Dong H.
    Energy Engineering: Journal of the Association of Energy Engineering, 2023, 120 (04): : 949 - 963
  • [29] CAPACITY UTILIZATION BOTTLENECK EFFICIENCY SYSTEM - CUBES
    KONOPKA, JM
    IEEE TRANSACTIONS ON COMPONENTS PACKAGING AND MANUFACTURING TECHNOLOGY PART A, 1995, 18 (03): : 484 - 491