Optimizing construction time and cost using ant colony optimization approach

被引:85
|
作者
Ng, S. Thomas [1 ]
Zhang, Yanshuai [1 ]
机构
[1] Univ Hong Kong, Dept Civil Engn, Hong Kong, Hong Kong, Peoples R China
关键词
D O I
10.1061/(ASCE)0733-9364(2008)134:9(721)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Time and cost are the most important factors to be considered in every construction project. In order to maximize the return, both the client and contractor would strive to optimize the project duration and cost concurrently. Over the years, many research studies have been conducted to model the time-cost relationships, and the modeling techniques range from the heuristic methods and mathematical approaches to genetic algorithms. Despite that, previous studies often assumed the time being constant leaving the analyses based purely on a single objective-cost. Acknowledging the significance of time-cost optimization, an evolutionary-based optimization algorithm known as ant colony optimization is applied to solve the multiobjective time-cost optimization problems. In this paper, the basic mechanism of the proposed model is unveiled. Having developed a program in the Visual Basic platform, tests are conducted to compare the performance of the proposed model against other analytical methods previously used for time-cost modeling. The results show that the ant colony system approach is able to generate better solutions without utilizing much computational resources which provides a useful means to support planners and managers in making better time-cost decisions efficiently.
引用
收藏
页码:721 / 728
页数:8
相关论文
共 50 条
  • [41] Ant colony approach to continuous function optimization
    Mathur, M
    Karale, SB
    Priye, S
    Jayaraman, VK
    Kulkarni, BD
    INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2000, 39 (10) : 3814 - 3822
  • [42] Applying an ant colony optimization algorithm-based multiobjective approach for time-cost trade-off
    Xiong, Ying
    Kuang, Yaping
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2008, 134 (02) : 153 - 156
  • [44] Novel Approach to Nonlinear PID Parameter Optimization Using Ant Colony Optimization Algorithm
    Duan H.-b.
    Wang D.-b.
    Yu X.-f.
    Journal of Bionic Engineering, 2006, 3 (2) : 73 - 78
  • [45] Time-cost trade-off of construction project based on ant colony algorithm
    Xiong, Ying
    Kuang, Ya-Ping
    Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2007, 27 (03): : 105 - 111
  • [46] Topology Optimization of Structures Using Ant Colony Optimization
    Wu, Chun-Yin
    Zhang, Ching-Bin
    Wang, Chi-Jer
    WORLD SUMMIT ON GENETIC AND EVOLUTIONARY COMPUTATION (GEC 09), 2009, : 601 - 607
  • [47] Optimizing energy management in microgrids with ant colony optimization: enhancing reliability and cost efficiency for sustainable energy systems
    Kamarposhti, Mehrdad Ahmadi
    Shokouhandeh, Hassan
    Lee, Yeonwoo
    Kang, Sun-Kyoung
    Colak, Ilhami
    Barhoumi, El Manaa
    INTERNATIONAL JOURNAL OF LOW-CARBON TECHNOLOGIES, 2024, 19 : 2848 - 2856
  • [48] Optimizing Routes in Mobile Ad Hoc Networks Using Genetic Algorithm and Ant Colony Optimization
    Vidhate, Pankaj Uttam
    Bichkar, R. S.
    Wankhade, Yogita
    PROCEEDINGS OF THE SECOND INTERNATIONAL CONFERENCE ON COMPUTER AND COMMUNICATION TECHNOLOGIES, IC3T 2015, VOL 1, 2016, 379 : 557 - 565
  • [49] Minimizing Total Cost in Integrated Scheduling of Production and Distribution Using Ant Colony Optimization
    Sukmarini, M. A.
    Abusini, S.
    Karim, C.
    2019 CONFERENCE ON FUNDAMENTAL AND APPLIED SCIENCE FOR ADVANCED TECHNOLOGY, 2019, 1373
  • [50] Optimizing task allocation in workflow system based on ant colony optimization
    Lyu L.
    Hu H.
    Li Z.
    Chen J.
    Hu H.
    Hu, Haiyang (huhaiyang@hdu.edu.cn), 1723, CIMS (24): : 1723 - 1735