Research on resource optimization of concurrent product development process on DSM

被引:0
|
作者
Qian, Xiaoming [1 ]
Tang, Dunbing [1 ]
机构
[1] Nanjing Univ Aeronaut & Astronaut, Coll Mech & Elect Engn, Nanjing 210016, Peoples R China
关键词
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
One of the most important problems of Concurrent Product Development Process (CPDP) is to handle resource competition due to its concurrence. In this article an algorithm for resource scheduling and optimization is presented based on Design Structure Matrix (DSM) for CPDP. First the aggregate DSM model, the schedule model and the resource model of CPDP are established. Furthermore, the algorithm is implemented by combining the genetic algorithms with the heuristic rules. At last a case study for certain product development process is used to validate the algorithm and the heuristic rules on resource optimization.
引用
收藏
页码:1538 / 1543
页数:6
相关论文
共 50 条
  • [11] Concurrent design process analysis and optimization for aluminum profile extrusion product development
    Hong-Qin Wei
    [J]. The International Journal of Advanced Manufacturing Technology, 2007, 33 : 652 - 661
  • [12] Research on Concurrent Engineering Oriented Integrated Product Development Process Management System
    Cao Jian Zhang Shengsheng He Yuanjun CIT Lab
    [J]. CADDM, 2001, DesignandManufacturing.2001 (01) : 48 - 55
  • [13] Research on concurrent engineering oriented integrated product development process management system
    Cao, Jian
    Zhang, Shensheng
    Hu, Jinmin
    [J]. 2002, China Mechanical Engineering Magazine Office (13):
  • [14] Optimization and management of concurrent product development processes
    Baake, UF
    Stratil, P
    Haussmann, DE
    [J]. CONCURRENT ENGINEERING-RESEARCH AND APPLICATIONS, 1999, 7 (01): : 31 - 42
  • [15] Concurrent engineering for product, process and market development
    Fukuda, S
    [J]. CONCURRENT ENGINEERING: THE WORLDWIDE ENGINEERING GRID, PROCEEDINGS, 2004, : 35 - 42
  • [16] Product Development Process Simulation for Concurrent Engineering
    吴祚宝
    [J]. High Technology Letters, 1996, (01) : 1 - 4
  • [17] Structured approach to concurrent product/process development
    Lemon, Jason R.
    Carl, Edward J.
    [J]. Manufacturing Systems, 1991, 9 (06):
  • [18] Product development process simulation for concurrent engineering
    Wu, Zuobao
    Xiong, Guangleng
    Peng, Yi
    [J]. High Technology Letters, 1996, 2 (01): : 1 - 4
  • [19] Optimal resource allocation for dynamic product development process via convex optimization
    Zhao, Chengyan
    Ogura, Masaki
    Kishida, Masako
    Yassine, Ali
    [J]. RESEARCH IN ENGINEERING DESIGN, 2021, 32 (01) : 71 - 90
  • [20] Optimal resource allocation for dynamic product development process via convex optimization
    Chengyan Zhao
    Masaki Ogura
    Masako Kishida
    Ali Yassine
    [J]. Research in Engineering Design, 2021, 32 : 71 - 90