Optimization and management of concurrent product development processes

被引:2
|
作者
Baake, UF
Stratil, P
Haussmann, DE
机构
[1] HPT, BR-01404002 Sao Paulo, Brazil
[2] Daimler Benz AG, ODN S, D-70322 Stuttgart, Germany
[3] HIPD, B4-01404002 Sao Paulo, Brazil
来源
关键词
D O I
10.1177/1063293X9900700104
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
As a result of the continually growing challenges of intense competition, new development process and technology innovations may shortly replace current structures in the product development and production process chain. The globalization of markets does not only create new business opportunities but also is challenged by new, worldwide competition. As a result, there is a need to reduce product development times, to realize highly concurrent engineering processes and to integrate company-wide resources as well as local and global suppliers. Such processes require highly skilled experts, fast and stable procedures and lean and flexible organizations. This report illustrates the introduction of new methods and tools for engineering, allowing faster and higher integrated development and production processes within an international environment. Experiences of the proposed methods will be briefly outlined in this approach that have already been proved in Europe and Southern America.
引用
收藏
页码:31 / 42
页数:12
相关论文
共 50 条
  • [1] Management of concurrent engineering processes in international product development
    Baake, UF
    Haussmann, DE
    [J]. GLOBALIZATION OF MANUFACTURING IN THE DIGITAL COMMUNICATIONS ERA OF THE 21ST CENTURY: INNOVATION, AGILITY, AND THE VIRTUAL ENTERPRISE, 1998, : 1 - 12
  • [2] Scheduling approach for concurrent product development processes
    Yan, JH
    Wu, C
    [J]. COMPUTERS IN INDUSTRY, 2001, 46 (02) : 139 - 147
  • [3] Research on concurrent management of new product development
    Hou, KH
    Niu, X
    Lu, H
    [J]. PROCEEDINGS OF THE SEVENTH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, 2000, : 76 - 80
  • [4] Modeling and optimization of process of product development in concurrent engineering
    Dong, ZB
    Yan, JW
    Wu, QD
    [J]. PROCEEDINGS OF THE 3RD WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION, VOLS 1-5, 2000, : 2132 - 2136
  • [5] Concurrent optimization of the design and manufacturing stages of product development
    Lamghabbar, A
    Yacout, S
    Ouali, MS
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2004, 42 (21) : 4495 - 4512
  • [6] Time-to-market and concurrent engineering in product development processes
    Belay, Alemu Moges
    Kekale, Tauno
    Helo, Petri
    [J]. INTERNATIONAL JOURNAL OF INNOVATION AND LEARNING, 2011, 10 (01) : 60 - 84
  • [7] A concurrent workflow management process for integrated product development
    Prasad, B
    Wang, FJ
    Deng, JT
    [J]. JOURNAL OF ENGINEERING DESIGN, 1998, 9 (02) : 121 - 135
  • [8] Research on resource optimization of concurrent product development process on DSM
    Qian, Xiaoming
    Tang, Dunbing
    [J]. PROCEEDINGS OF 2007 IEEE INTERNATIONAL CONFERENCE ON GREY SYSTEMS AND INTELLIGENT SERVICES, VOLS 1 AND 2, 2007, : 1538 - 1543
  • [9] VARIATION MANAGEMENT IN PRODUCT DEVELOPMENT AND MANUFACTURING PROCESSES
    Belgiu, George
    Albu, Adriana
    Ruset, Vasile
    [J]. ANNALS OF DAAAM FOR 2009 & PROCEEDINGS OF THE 20TH INTERNATIONAL DAAAM SYMPOSIUM, 2009, 20 : 1725 - 1726
  • [10] Competence management for the optimisation of product development processes
    Krause, F. -L.
    Hackers, W.
    Debitz, U.
    Kind, C.
    Strebel, M.
    [J]. CIRP ANNALS-MANUFACTURING TECHNOLOGY, 2006, 55 (01) : 135 - 138