Research on resource optimization of concurrent product development process on DSM

被引:0
|
作者
Qian, Xiaoming [1 ]
Tang, Dunbing [1 ]
机构
[1] Nanjing Univ Aeronaut & Astronaut, Coll Mech & Elect Engn, Nanjing 210016, Peoples R China
关键词
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
One of the most important problems of Concurrent Product Development Process (CPDP) is to handle resource competition due to its concurrence. In this article an algorithm for resource scheduling and optimization is presented based on Design Structure Matrix (DSM) for CPDP. First the aggregate DSM model, the schedule model and the resource model of CPDP are established. Furthermore, the algorithm is implemented by combining the genetic algorithms with the heuristic rules. At last a case study for certain product development process is used to validate the algorithm and the heuristic rules on resource optimization.
引用
收藏
页码:1538 / 1543
页数:6
相关论文
共 50 条
  • [1] Research on DSM for simulation of concurrent product development process
    Qian, X. M.
    Tang, D. B.
    [J]. MATERIALS AND PRODUCT TECHNOLOGIES, 2008, 44-46 : 595 - 600
  • [2] DSM based process analysis for concurrent product development and its implementation
    Zhong, Peisi
    Song, Jiandong
    Liu, Mei
    [J]. PROCEEDINGS OF THE 2008 12TH INTERNATIONAL CONFERENCE ON COMPUTER SUPPORTED COOPERATIVE WORK IN DESIGN, VOLS I AND II, 2008, : 619 - 624
  • [3] Modeling and optimization of process of product development in concurrent engineering
    Dong, ZB
    Yan, JW
    Wu, QD
    [J]. PROCEEDINGS OF THE 3RD WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION, VOLS 1-5, 2000, : 2132 - 2136
  • [4] DSM based multi-view process modelling method for concurrent product development
    Zhong, Peisi
    Cheng, Hongmei
    Liu, Mei
    Ding, Shuhui
    [J]. GLOBAL DESIGN TO GAIN A COMPETITIVE EDGE: AN HOLISTIC AND COLLABORATIVE DESIGN APPROACH BASED ON COMPUTATIONAL TOOLS, 2008, : 261 - +
  • [5] Research on resource scheduling for development process of complicated product
    Cao, SQ
    Chen, Y
    Han, YL
    Fang, ML
    [J]. PROCEEDINGS OF THE NINTH INTERNATIONAL CONFERENCE ON COMPUTER SUPPORTED COOPERATIVE WORK IN DESIGN, VOLS 1 AND 2, 2005, : 229 - 233
  • [6] AN OVERLAPPING MODEL FOR NEW PRODUCT DEVELOPMENT PROCESS OPTIMIZATION USING DSM METHOD
    Yang, Qing
    Zhang, Xiaofeng
    Li, Jiewei
    [J]. 2011 INTERNATIONAL CONFERENCE ON INSTRUMENTATION, MEASUREMENT, CIRCUITS AND SYSTEMS (ICIMCS 2011), VOL 3: COMPUTER-AIDED DESIGN, MANUFACTURING AND MANAGEMENT, 2011, : 53 - 56
  • [7] Research on group decision support system for concurrent product development process
    Zhao, HY
    Zhang, YL
    Wang, ZL
    Lee, SF
    Kwong, WC
    [J]. JOURNAL OF MATERIALS PROCESSING TECHNOLOGY, 2003, 139 (1-3) : 619 - 623
  • [8] Concurrent design process analysis and optimization for aluminum profile extrusion product development
    Wei, Hong-Qin
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2007, 33 (7-8): : 652 - 661
  • [9] Concurrent design process analysis and optimization for aluminum profile extrusion product development
    Hong-Qin Wei
    [J]. The International Journal of Advanced Manufacturing Technology, 2007, 33 : 652 - 661
  • [10] Research on Concurrent Engineering Oriented Integrated Product Development Process Management System
    Cao Jian Zhang Shengsheng He Yuanjun CIT Lab
    [J]. CADDM, 2001, DesignandManufacturing.2001 (01) : 48 - 55