共 50 条
- [42] Two-machine, no-wait job shop problem with separable setup times and single-server constraints [J]. The International Journal of Advanced Manufacturing Technology, 2013, 65 : 295 - 308
- [43] Two-machine, no-wait job shop problem with separable setup times and single-server constraints [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 65 (1-4): : 295 - 308
- [44] Three-machine no-wait flowshop with separate setup and removal times to minimize total completion time [J]. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2004, 11 (02): : 113 - 123
- [47] Bicriteria scheduling of a two-machine flowshop with sequence-dependent setup times [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 40 (11-12): : 1216 - 1226
- [48] Bicriteria scheduling of a two-machine flowshop with sequence-dependent setup times [J]. The International Journal of Advanced Manufacturing Technology, 2009, 40 : 1216 - 1226