A BETTER DOMINANCE RELATION AND HEURISTICS FOR TWO-MACHINE NO-WAIT FLOWSHOPS WITH MAXIMUM LATENESS PERFORMANCE MEASURE

被引:7
|
作者
Allahverdi, Muberra [1 ]
Aydilek, Harun [2 ]
Aydilek, Asiye [3 ]
Allahverdi, Ali [4 ]
机构
[1] Kean Univ, Union, NJ 07083 USA
[2] Gulf Univ Sci & Technol, Math & Nat Sci Dept, Kuwait, Kuwait
[3] Gulf Univ Sci & Technol, Econ & Finance Dept, Kuwait, Kuwait
[4] Kuwait Univ, Dept Ind & Management Syst Engn, Kuwait, Kuwait
关键词
Flowshop; Scheduling-No-wait-Two-machine-Maxium; Lateness-Uncertain; Setup Times; SCHEDULING PROBLEM; BOUNDED SETUP; SINGLE-MACHINE; TARDINESS; BLOCKING; TIMES;
D O I
10.3934/jimo.2020054
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this paper, we consider a manufacturing system with two-machine no-wait flowshop scheduling problem where setup times are uncertain. The problem with the performance measure of maximum lateness was addressed in the literature (Computational and Applied Mathematics 37, 67746794) where dominance relations were proposed. We establish a new dominance relation and show that the new dominance relation is, on average, about 90 % more efficient than the existing ones. Moreover, since it is highly unlikely to find optimal solutions for problems of reasonable size by utilizing dominance relations and since there exist no heuristic in the literature for the problem, we propose constructive heuristics to solve real life problems. We conduct extensive computational experiments to evaluate the proposed heuristics. Computational experiments indicate that the performance of the worst proposed heuristic is at least 20 % better than a benchmark solution. Furthermore, they also indicate that the best proposed heuristic is about 130% better than the worst one. The average CPU time of the heuristics is significantly less than a second.