Manufacturing Scheduling Problem Based on Fuzzy Genetic Algorithm

被引:0
|
作者
Gladkov, Leonid [1 ]
Gladkova, Nadezhda [1 ]
Leiba, Sergey [1 ]
机构
[1] Southern Fed Univ, Deparment Comp Aided Design, 55 Frunze St, Taganrog, Russia
关键词
D O I
暂无
中图分类号
TP3 [计算技术、计算机技术];
学科分类号
0812 ;
摘要
An important problem of manufacturing scheduling and planning is reviewed. Basic criteria and heuristic rules used in scheduling are considered. The method of manufacturing scheduling based on combining genetic algorithms and fuzzy controller are suggested. Some logical rules for fuzzy controller are specified, and the structure of proposed algorithm is explained. In order to show the effectiveness of suggested techniques computing experiments are performed.
引用
收藏
页数:4
相关论文
共 50 条
  • [41] Fuzzy Flexible Resource Constrained Project Scheduling Based on Genetic Algorithm
    查鸿
    张连营
    Transactions of Tianjin University, 2014, (06) : 469 - 474
  • [42] Fuzzy Critical Chain Method Based on Genetic Algorithm for Project Scheduling
    Bai, Chunguang
    Gershon, Mark
    Wei, Xiaopeng
    INFORMATION-AN INTERNATIONAL INTERDISCIPLINARY JOURNAL, 2010, 13 (3B): : 877 - 892
  • [43] Fuzzy Flexible Resource Constrained Project Scheduling Based on Genetic Algorithm
    查鸿
    张连营
    Transactions of Tianjin University, 2014, 20 (06) : 469 - 474
  • [44] Fuzzy flexible resource constrained project scheduling based on genetic algorithm
    Zha H.
    Zhang L.
    Transactions of Tianjin University, 2014, 20 (6) : 469 - 474
  • [45] Genetic Algorithm for the Single Machine Earliness and Tardiness Scheduling Problem with Fuzzy Processing Times
    Wang Chengyao
    Zhao Ying
    Wei Shaoqian
    PROCEEDINGS OF THE 29TH CHINESE CONTROL CONFERENCE, 2010, : 1747 - 1752
  • [46] Observation on: A genetic algorithm for solving a fuzzy economic lot-size scheduling problem
    Goyal, S. K.
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2007, 105 (02) : 608 - 608
  • [47] Fuzzy scheduling problem with multi-processors using genetic algorithm for railway management
    He, SW
    Song, R
    Hu, AZ
    ISIM'2000: PROCEEDINGS OF THE FIFTH CHINA-JAPAN INTERNATIONAL SYMPOSIUM ON INDUSTRIAL MANAGEMENT, 2000, : 9 - 15
  • [48] SOLVING FUZZY DYNAMIC SHIP ROUTING AND SCHEDULING PROBLEM THROUGH MODIFIED GENETIC ALGORITHM
    Das M.
    Roy A.
    Maity S.
    Kar S.
    Sengupta S.
    Decision Making: Applications in Management and Engineering, 2022, 5 (02): : 329 - 361
  • [49] Leveling of resources in staff scheduling problem based on hybrid genetic algorithm
    Hirano, Kayoko
    Tasan, Seren Ozmehmet
    Gen, Mitsuo
    Oyabu, Takashi
    PROCEEDING OF THE SEVENTH INTERNATIONAL CONFERENCE ON INFORMATION AND MANAGEMENT SCIENCES, 2008, 7 : 473 - 479
  • [50] An intelligent search technique to train scheduling problem based on genetic algorithm
    Khan, Muhammad Babar
    Zhang, Dianye
    Jun, Ming Shi
    Li, Zhu Jiang
    SECOND INTERNATIONAL CONFERENCE ON EMERGING TECHNOLOGIES 2006, PROCEEDINGS, 2006, : 593 - +