共 50 条
- [42] Fuzzy Critical Chain Method Based on Genetic Algorithm for Project Scheduling INFORMATION-AN INTERNATIONAL INTERDISCIPLINARY JOURNAL, 2010, 13 (3B): : 877 - 892
- [45] Genetic Algorithm for the Single Machine Earliness and Tardiness Scheduling Problem with Fuzzy Processing Times PROCEEDINGS OF THE 29TH CHINESE CONTROL CONFERENCE, 2010, : 1747 - 1752
- [47] Fuzzy scheduling problem with multi-processors using genetic algorithm for railway management ISIM'2000: PROCEEDINGS OF THE FIFTH CHINA-JAPAN INTERNATIONAL SYMPOSIUM ON INDUSTRIAL MANAGEMENT, 2000, : 9 - 15
- [48] SOLVING FUZZY DYNAMIC SHIP ROUTING AND SCHEDULING PROBLEM THROUGH MODIFIED GENETIC ALGORITHM Decision Making: Applications in Management and Engineering, 2022, 5 (02): : 329 - 361
- [49] Leveling of resources in staff scheduling problem based on hybrid genetic algorithm PROCEEDING OF THE SEVENTH INTERNATIONAL CONFERENCE ON INFORMATION AND MANAGEMENT SCIENCES, 2008, 7 : 473 - 479
- [50] An intelligent search technique to train scheduling problem based on genetic algorithm SECOND INTERNATIONAL CONFERENCE ON EMERGING TECHNOLOGIES 2006, PROCEEDINGS, 2006, : 593 - +