A simulation-based design framework for automated material handling systems in 300mm fabrication facilities

被引:16
|
作者
Nazzal, D [1 ]
Bodner, DA [1 ]
机构
[1] Georgia Inst Technol, Sch Ind & Syst Engn, Atlanta, GA 30332 USA
关键词
D O I
10.1109/WSC.2003.1261573
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This paper describes a methodology to tackle the problem of designing Automated Material Handling Systems (AMHS) for 300mm wafer fabrication facilities. The proposed framework divides the design process into two levels: architectural and elaborative. Prior to the design, fab data are preprocessed using simulation of manufacturing operations. The output data and fab requirements data are then profiled to aid in design decision making at the architectural level. Once architectural design decisions are made, lower-level design decisions are made and analyzed using a simulation model that incorporates the AMHS. Due to the potential number of alternatives and time constraints on the design process, we are exploring rapid model generation methods. In this paper, we describe our progress to date in creating this methodology.
引用
收藏
页码:1351 / 1359
页数:9
相关论文
共 50 条
  • [41] Design and Validation of a Simulation-based Modular Planning and Scheduling System of Semiconductor Fabrication Facilities
    Li Li
    Qiao Fei
    MEASURING TECHNOLOGY AND MECHATRONICS AUTOMATION, PTS 1 AND 2, 2011, 48-49 : 378 - 381
  • [42] The evaluation of search range assignment in 300 mm automated material handling system (AMHS)
    Sha, D. Y.
    Lin, J. T.
    Yang, C. J.
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2008, 35 (7-8): : 697 - 710
  • [43] The evaluation of search range assignment in 300 mm automated material handling system (AMHS)
    D. Y. Sha
    J. T. Lin
    C. J. Yang
    The International Journal of Advanced Manufacturing Technology, 2008, 35 : 697 - 710
  • [44] Simulation-based design and validation of Automated Contingency Management for propulsion systems
    Tang, Liang
    Saxena, Abhinav
    Orchard, Marcos E.
    Kacprzynski, Gregory J.
    Vachtsevanos, George
    Patterson-Hine, Ann
    2007 IEEE AEROSPACE CONFERENCE, VOLS 1-9, 2007, : 3708 - +
  • [45] Modularized simulation for lot delivery time forecast in automatic material handling systems of 300 mm semiconductor manufacturing
    Liang, SK
    Wang, CN
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2005, 26 (5-6): : 645 - 652
  • [46] Modularized simulation for lot delivery time forecast in automatic material handling systems of 300 mm semiconductor manufacturing
    Shing-Ko Liang
    Chia-Nan Wang
    The International Journal of Advanced Manufacturing Technology, 2005, 26 : 645 - 652
  • [48] CONTROL AND COMMUNICATIONS FOR INTEGRATION OF AUTOMATED MATERIALS HANDLING SYSTEMS IN WAFER FABRICATION FACILITIES
    DILWORTH, JC
    JOURNAL OF THE ELECTROCHEMICAL SOCIETY, 1988, 135 (08) : C370 - C370
  • [49] Towards a comprehensive framework for simulation-based design validation of vehicle systems
    Kokkolaras, M.
    Hulbert, G.
    Papalambros, P.
    Mourelatos, Z.
    Yang, R. J.
    Brudnak, M.
    Gorsich, D.
    INTERNATIONAL JOURNAL OF VEHICLE DESIGN, 2013, 61 (1-4) : 233 - 248
  • [50] Simulation-based optimal planning for material handling networks in mining
    Nageshwaraniyer, Sai Srinivas
    Son, Young-Jun
    Dessureault, Sean
    SIMULATION-TRANSACTIONS OF THE SOCIETY FOR MODELING AND SIMULATION INTERNATIONAL, 2013, 89 (03): : 330 - 345