共 50 条
- [41] Design and Validation of a Simulation-based Modular Planning and Scheduling System of Semiconductor Fabrication Facilities MEASURING TECHNOLOGY AND MECHATRONICS AUTOMATION, PTS 1 AND 2, 2011, 48-49 : 378 - 381
- [42] The evaluation of search range assignment in 300 mm automated material handling system (AMHS) INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2008, 35 (7-8): : 697 - 710
- [43] The evaluation of search range assignment in 300 mm automated material handling system (AMHS) The International Journal of Advanced Manufacturing Technology, 2008, 35 : 697 - 710
- [44] Simulation-based design and validation of Automated Contingency Management for propulsion systems 2007 IEEE AEROSPACE CONFERENCE, VOLS 1-9, 2007, : 3708 - +
- [45] Modularized simulation for lot delivery time forecast in automatic material handling systems of 300 mm semiconductor manufacturing INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2005, 26 (5-6): : 645 - 652
- [46] Modularized simulation for lot delivery time forecast in automatic material handling systems of 300 mm semiconductor manufacturing The International Journal of Advanced Manufacturing Technology, 2005, 26 : 645 - 652
- [50] Simulation-based optimal planning for material handling networks in mining SIMULATION-TRANSACTIONS OF THE SOCIETY FOR MODELING AND SIMULATION INTERNATIONAL, 2013, 89 (03): : 330 - 345