Tactical capacity planning for semiconductor manufacturing: MILP models and scalable distributed parallel algorithms

被引:7
|
作者
Zhou, Rui-Jie [1 ]
Li, Li-Juan [2 ]
机构
[1] Stanford Univ, Dept Elect Engn, Stanford, CA 94305 USA
[2] Rensselaer Polytech Inst, Dept Chem & Biol Engn, Troy, NY 12180 USA
关键词
semiconductor manufacturing; capacity planning; two-stage stochastic integer optimization; distributed parallel optimization; scalable optimization; INTENSIVE CONTINUOUS-PROCESSES; SENSITIVE ELECTRICITY PRICES; ENTERPRISE-WIDE OPTIMIZATION; CLINICAL-TRIALS UNCERTAINTY; OPTIMAL SCENARIO REDUCTION; FABRICATION FACILITIES; ROBUST OPTIMIZATION; FINANCIAL RISK; INVESTMENT; MANAGEMENT;
D O I
10.1002/aic.15309
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
A multiperiod stochastic mixed-integer linear programming model is developed to address the tactical capacity planning of semiconductor manufacturing with considerations of complex routing of material flows, in-process inventory, demand and capacity variability, multisite production, capacity utilization rate, and downside risk management. Both planning level decisions (i.e., capacity allocation and customer service level decisions) as well as operational level decisions (i.e., production, inventory, and shipment decisions) can be simultaneously determined based on the two proposed multiobjective optimization models. To address the huge number of scenarios needed to characterize the uncertainty and the large number of first-stage integer variables in industrial scale applications, two novel scalable distributed parallel optimization algorithms are developed to mitigate the computational burden. The proposed mathematical models and algorithms are illustrated through two case studies from a major US semiconductor manufacturer. Results from these case studies provide key decision support for capacity expansion in semiconductor industry. (c) 2016 American Institute of Chemical Engineers AIChE J, 62: 3930-3946, 2016
引用
收藏
页码:3930 / 3946
页数:17
相关论文
共 43 条
  • [1] Tool capacity planning in semiconductor manufacturing
    Çatay, B
    Erengüç, SS
    Vakharia, AJ
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2003, 30 (09) : 1349 - 1366
  • [2] Robust capacity planning in semiconductor manufacturing
    Barahona, F
    Bermon, S
    Günlük, O
    Hood, S
    [J]. NAVAL RESEARCH LOGISTICS, 2005, 52 (05) : 459 - 468
  • [3] A STEP TOWARD CAPACITY PLANNING AT FINITE CAPACITY IN SEMICONDUCTOR MANUFACTURING
    Mhiri, Emna
    Jacomino, Mireille
    Mangione, Fabien
    Vialletelle, Philippe
    Lepelletier, Guillaume
    [J]. PROCEEDINGS OF THE 2014 WINTER SIMULATION CONFERENCE (WSC), 2014, : 2239 - 2250
  • [4] Survey on Parallel and Distributed Optimization Algorithms for Scalable Machine Learning
    Kang, Liang-Yi
    Wang, Jian-Fei
    Liu, Jie
    Ye, Dan
    [J]. Ruan Jian Xue Bao/Journal of Software, 2018, 29 (01): : 109 - 130
  • [5] Capacity planning under demand uncertainty for semiconductor manufacturing
    Hood, SJ
    Bermon, S
    Barahona, F
    [J]. IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 2003, 16 (02) : 273 - 280
  • [6] Capacity planning with reconfigurable kits in semiconductor test manufacturing
    Zhang, Z.
    Zhang, M. T.
    Niu, S.
    Zheng, L.
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2006, 44 (13) : 2625 - 2644
  • [7] Capacity planning with capability for multiple semiconductor manufacturing fabs
    Chen, JC
    Chen, CW
    Lin, CJ
    Rau, H
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2005, 48 (04) : 709 - 732
  • [8] A review on strategic capacity planning for the semiconductor manufacturing industry
    Geng, Na
    Jiang, Zhibin
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2009, 47 (13) : 3639 - 3655
  • [9] Option-based capacity planning for semiconductor manufacturing
    Liang, YY
    Chou, YC
    [J]. 2003 IEEE INTERNATIONAL SYMPOSIUM ON SEMICONDUCTOR MANUFACTURING, CONFERENCE PROCEEDINGS, 2003, : 77 - +
  • [10] A finite capacity production planning approach for semiconductor manufacturing
    Habla, C.
    Moench, L.
    Driessel, R.
    [J]. 2007 IEEE INTERNATIONAL CONFERENCE ON AUTOMATION SCIENCE AND ENGINEERING, VOLS 1-3, 2007, : 401 - 406