A finite capacity production planning approach for semiconductor manufacturing

被引:0
|
作者
Habla, C. [1 ]
Moench, L. [1 ]
Driessel, R. [1 ]
机构
[1] Univ Hagen, Dept Math & Comp Sci, D-58097 Hagen, Germany
关键词
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In this paper, we suggest a production planning approach that takes the finite capacity of the manufacturing system into account. The approach is based on a reduced level of detail modeling of the process flows. We consider explicitly only bottleneck steps. A mixed integer programming (MIP) formulation is suggested to determine completion time targets for the bottleneck steps of the lots. A Lagrange relaxation technique is applied to solve the MIP approximately. We present some preliminary results of computational experiments that demonstrate some promising features of the suggested approach with respect to solution quality and time needed for computation.
引用
收藏
页码:401 / 406
页数:6
相关论文
共 50 条
  • [1] A STEP TOWARD CAPACITY PLANNING AT FINITE CAPACITY IN SEMICONDUCTOR MANUFACTURING
    Mhiri, Emna
    Jacomino, Mireille
    Mangione, Fabien
    Vialletelle, Philippe
    Lepelletier, Guillaume
    PROCEEDINGS OF THE 2014 WINTER SIMULATION CONFERENCE (WSC), 2014, : 2239 - 2250
  • [2] Robust capacity planning in semiconductor manufacturing
    Barahona, F
    Bermon, S
    Günlük, O
    Hood, S
    NAVAL RESEARCH LOGISTICS, 2005, 52 (05) : 459 - 468
  • [3] Tool capacity planning in semiconductor manufacturing
    Çatay, B
    Erengüç, SS
    Vakharia, AJ
    COMPUTERS & OPERATIONS RESEARCH, 2003, 30 (09) : 1349 - 1366
  • [4] Finite-capacity production planning algorithms for a semiconductor wafer fabrication facility
    Horiguchi, K
    Raghavan, N
    Uzsoy, R
    Venkateswaran, S
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2001, 39 (05) : 825 - 842
  • [5] A finite-capacity beam-search-algorithm for production scheduling in semiconductor manufacturing
    Habenicht, I
    Mönch, L
    PROCEEDINGS OF THE 2002 WINTER SIMULATION CONFERENCE, VOLS 1 AND 2, 2002, : 1406 - 1413
  • [6] Capacity planning under demand uncertainty for semiconductor manufacturing
    Hood, SJ
    Bermon, S
    Barahona, F
    IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 2003, 16 (02) : 273 - 280
  • [7] Capacity planning with reconfigurable kits in semiconductor test manufacturing
    Zhang, Z.
    Zhang, M. T.
    Niu, S.
    Zheng, L.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2006, 44 (13) : 2625 - 2644
  • [8] Capacity planning with capability for multiple semiconductor manufacturing fabs
    Chen, JC
    Chen, CW
    Lin, CJ
    Rau, H
    COMPUTERS & INDUSTRIAL ENGINEERING, 2005, 48 (04) : 709 - 732
  • [9] Option-based capacity planning for semiconductor manufacturing
    Liang, YY
    Chou, YC
    2003 IEEE INTERNATIONAL SYMPOSIUM ON SEMICONDUCTOR MANUFACTURING, CONFERENCE PROCEEDINGS, 2003, : 77 - +
  • [10] A review on strategic capacity planning for the semiconductor manufacturing industry
    Geng, Na
    Jiang, Zhibin
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2009, 47 (13) : 3639 - 3655