Capacity planning under demand uncertainty for semiconductor manufacturing

被引:89
|
作者
Hood, SJ [1 ]
Bermon, S
Barahona, F
机构
[1] IBM Corp, Microelect Div, Hopewell Jct, NY 12533 USA
[2] IBM Corp, Thomas J Watson Res Ctr, Yorktown Hts, NY 10598 USA
关键词
capacity planning; demand scenarios; demand uncertainty; semiconductor manufacturing; stochastic optimization;
D O I
10.1109/TSM.2003.811894
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In the semiconductor industry, capacity planning, the calculation of number of tools needed to manufacture forecasted product demands, is difficult because of sensitivity to product mix and uncertainty in future demand. Planning for a single demand profile can result in a large gap between planned capacity and actual capability when the realized product mix turns out differently from the one planned. This paper presents a method which accepts this uncertainty and uses stochastic,integer programming to find a tool set robust to changes in demand. It considers a set of possible, discrete demand scenarios with associated probabilities, and determines the tools to purchase, under a budget constraint, to minimize weighted average unmet demand. The resulting robust tool set deals well with all the scenarios at no or minimal additional cost compared to that for a single demand profile. We also discuss the modifications of conventional business processes, needed to implement this method for dealing explicitly with uncertainty in demand.
引用
收藏
页码:273 / 280
页数:8
相关论文
共 50 条
  • [1] Production planning for semiconductor manufacturing under demand and yield uncertainty
    Rashidi, Eghbal
    Bhuiyan, Tanveer Hossain
    Mason, Scott J.
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2024, 196
  • [2] Robust Models for Manufacturing Capacity Planning under Demand Uncertainty
    Karnik, Aditya
    Tallichetty, Chandrashekar S.
    Saroop, Atul
    [J]. 2009 IEEE INTERNATIONAL CONFERENCE ON AUTOMATION SCIENCE AND ENGINEERING, 2009, : 310 - 315
  • [3] Tool capacity planning for semiconductor fabrication facilities under demand uncertainty
    Swaminathan, JM
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2000, 120 (03) : 545 - 558
  • [4] Coordinated capacity migration and expansion planning for semiconductor manufacturing under demand uncertainties
    Chien, Chen-Fu
    Wu, Cheng-Hung
    Chiang, Yu-Shian
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2012, 135 (02) : 860 - 869
  • [5] DERIVED DEMAND AND CAPACITY PLANNING UNDER UNCERTAINTY
    MODIANO, EM
    [J]. OPERATIONS RESEARCH, 1987, 35 (02) : 185 - 197
  • [6] Supply network capacity planning for semiconductor manufacturing with uncertain demand and correlation in demand considerations
    Rastogi, Aditya P.
    Fowler, John W.
    Carlyle, W. Matthew
    Araz, Ozgur M.
    Maltz, Arnold
    Bueke, Burak
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2011, 134 (02) : 322 - 332
  • [7] Production planning with flexible manufacturing systems under demand uncertainty
    Elyasi, Milad
    Altan, Basak
    Ekici, Ali
    Ozener, Okan Orsan
    Yanikoglu, Ihsan
    Dolgui, Alexandre
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2024, 62 (1-2) : 157 - 170
  • [8] Robust Capacity Planning in Network Coding under Demand Uncertainty
    Ghasvari, Hossien
    Raayatpanah, Mohammad Ali
    [J]. KSII TRANSACTIONS ON INTERNET AND INFORMATION SYSTEMS, 2015, 9 (08): : 2840 - 2853
  • [9] A general strategic capacity planning model under demand uncertainty
    Hub, WT
    Roundy, RO
    Çakanyildirim, M
    [J]. NAVAL RESEARCH LOGISTICS, 2006, 53 (02) : 137 - 150
  • [10] An empirical analysis of capacity and flexibility planning under demand uncertainty
    Hamidian, Nooshin
    Sawhney, Rapinder
    Pradhan, Ninad
    [J]. INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE AND ENGINEERING MANAGEMENT, 2021, 16 (03) : 165 - 174