Study on the Risk Evaluation Model of Utility Tunnel Project under a PPP Mode

被引:0
|
作者
Wang, Weiming [1 ]
Fang, Jun [1 ]
机构
[1] Wuhan Univ Technol, Sch Civil Engn & Architecture, Wuhan 430070, Hubei, Peoples R China
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
With the development of China's socialist market economy, public-private partnership (PPP) mode is providing a steady driving force for the new urbanization construction which has entered the fast lane. This mode not only revitalizes the abundant social capital, but also makes resource allocation more effective. As an important part of the new urbanization construction, the utility tunnel has been actively explored and piloted in the past 2 years. At the meantime, the risk management is the key to the success of the project. This paper is based on questionnaire survey to identify the risk factors of utility tunnel project in PPP mode, and uses SPSS 19 to test the reliability of the questionnaire. On this basis, the risk evaluation index system is designed, and then we use optimized fuzzy comprehensive evaluation to construct the risk evaluation model. Finally, an example is given to demonstrate the applicability of the risk evaluation model.
引用
收藏
页码:371 / 381
页数:11
相关论文
共 50 条
  • [31] Risk Evaluation Of Construction Project Based On Utility Function And Maximized Deviation
    Huang, Keyu
    Wang, Song
    [J]. 2008 4TH INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-31, 2008, : 10426 - 10429
  • [32] Innovation Project Investment Risk Evaluation Model
    Yuan Xiu-e
    Yuan Zhen-Zhen
    [J]. 2009 INTERNATIONAL CONFERENCE ON FUTURE BIOMEDICAL INFORMATION ENGINEERING (FBIE 2009), 2009, : 409 - 412
  • [33] Research on the risk allocation in PPP project under asymmetry condition of participant's status
    Yang, J. B.
    [J]. BASIC & CLINICAL PHARMACOLOGY & TOXICOLOGY, 2018, 123 : 105 - 106
  • [34] PPP project price mode typologies: a China-based comparative case study
    Guo, Yubo
    Liu, Jinchan
    Chen, Chuan
    Luo, Xiaowei
    Martek, Igor
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2024, 31 (05) : 2034 - 2052
  • [35] Study on the tunnel group traffic accident risk using a fuzzy comprehensive evaluation model
    Ma, Bin
    Gao, Rong
    Gao, Ying
    Wang, Xiaojie
    Guo, Zihan
    [J]. CIVIL, ARCHITECTURE AND ENVIRONMENTAL ENGINEERING, VOLS 1 AND 2, 2017, : 9 - 12
  • [36] Sensitivity analysis in investment project evaluation under risk
    Chen, Haiping
    [J]. PROCEEDINGS OF THE FIRST INTERNATIONAL CONFERENCE ON INFORMATION AND MANAGEMENT SCIENCES, 2002, 1 : 341 - 343
  • [37] An improved failure mode and effect analysis method for group decision-making in utility tunnels construction project risk evaluation
    Zhang, Pei
    Zhang, Zhen-Ji
    Gong, Da-Qing
    [J]. RELIABILITY ENGINEERING & SYSTEM SAFETY, 2024, 244
  • [38] Research on the Risk Evaluation of the Medical Care combined PPP Project Based on the Fuzzy Comprehensive Evaluation Method
    Wang, Lifang
    Xiong, Huaping
    [J]. CONFERENCE PROCEEDINGS OF THE 6TH INTERNATIONAL SYMPOSIUM ON PROJECT MANAGEMENT (ISPM2018), 2018, : 1287 - 1293
  • [39] Study on Investment Value under Government Guarantee in PPP Project Based on OnlineSimulation
    Dong, Runrun
    Huang, Hairong
    [J]. PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON LOGISTICS, ENGINEERING, MANAGEMENT AND COMPUTER SCIENCE (LEMCS 2015), 2015, 117 : 601 - 606
  • [40] Integrated Approach for Project Risk Assessment and Evaluation Under Risk Interactions
    Wang, Lei
    Qian, Chen
    Goh, Mark
    [J]. IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 2024, 71 : 2418 - 2429