共 50 条
- [1] China's Underground Comprehensive Utility Tunnel Project of PPP Mode Risk Identification [J]. ICCREM 2017: PREFABRICATED BUILDINGS, INDUSTRIALIZED CONSTRUCTION, AND PUBLIC-PRIVATE PARTNERSHIPS, 2017, : 318 - 327
- [2] Risk Identification and Allocation of the Utility Tunnel PPP Project [J]. MATERIALS SCIENCE, ENERGY TECHNOLOGY, AND POWER ENGINEERING I, 2017, 1839
- [3] Risk Evaluation System of Utility Tunnel PPP Project Research Based on Fuzzy Comprehensive Evaluation Method [J]. PROCEEDINGS OF THE 2017 INTERNATIONAL CONFERENCE ON INNOVATIONS IN ECONOMIC MANAGEMENT AND SOCIAL SCIENCE (IEMSS 2017), 2017, 29 : 550 - 555
- [4] STUDY ON RISK EVALUATION MODEL OF PPP PROJECT BASED ON VAGUE VALUE [J]. PROCEEDINGS OF THE FIRST INTERNATIONAL CONFERENCE ON SUSTAINABLE URBANIZATION (ICSU 2010), 2010, : 361 - 369
- [5] Research on Risk Management of Wise Medical Project under the PPP Mode [J]. PROCEEDINGS OF THE 7TH INTERNATIONAL CONFERENCE ON EDUCATION, MANAGEMENT, INFORMATION AND MECHANICAL ENGINEERING (EMIM 2017), 2017, 76 : 1130 - 1133
- [6] The Risk Evaluation of Beautiful Village Construction Project Based on PPP Mode [J]. ICCREM 2017: PREFABRICATED BUILDINGS, INDUSTRIALIZED CONSTRUCTION, AND PUBLIC-PRIVATE PARTNERSHIPS, 2017, : 119 - 130
- [7] The risk assessment of overseas infrastructure project by PPP/BOT mode [J]. Proceedings of 2005 International Conference on Construction & Real Estate Management, Vols 1 and 2: CHALLENGE OF INNOVATION IN CONSTRUCTION AND REAL ESTATE, 2005, : 1089 - 1091
- [9] The Construction Project PPP Risk Distribution Study [J]. PROCEEDINGS OF THE 2016 INTERNATIONAL CONFERENCE ON MODERN MANAGEMENT, EDUCATION TECHNOLOGY, AND SOCIAL SCIENCE (MMETSS 2016), 2016, 91 : 68 - 70