共 50 条
- [1] China's Underground Comprehensive Utility Tunnel Project of PPP Mode Risk Identification [J]. ICCREM 2017: PREFABRICATED BUILDINGS, INDUSTRIALIZED CONSTRUCTION, AND PUBLIC-PRIVATE PARTNERSHIPS, 2017, : 318 - 327
- [2] Study on the Risk Evaluation Model of Utility Tunnel Project under a PPP Mode [J]. ICCREM 2017: PREFABRICATED BUILDINGS, INDUSTRIALIZED CONSTRUCTION, AND PUBLIC-PRIVATE PARTNERSHIPS, 2017, : 371 - 381
- [3] Risk Evaluation System of Utility Tunnel PPP Project Research Based on Fuzzy Comprehensive Evaluation Method [J]. PROCEEDINGS OF THE 2017 INTERNATIONAL CONFERENCE ON INNOVATIONS IN ECONOMIC MANAGEMENT AND SOCIAL SCIENCE (IEMSS 2017), 2017, 29 : 550 - 555
- [4] Influence Factor Analysis to Risk Allocation for Hydropower PPP Project [J]. 2011 3RD WORLD CONGRESS IN APPLIED COMPUTING, COMPUTER SCIENCE, AND COMPUTER ENGINEERING (ACC 2011), VOL 4, 2011, 4 : 229 - +
- [5] Chartered Operating Model of PPP Project Based on Risk Allocation [J]. 2011 3RD WORLD CONGRESS IN APPLIED COMPUTING, COMPUTER SCIENCE, AND COMPUTER ENGINEERING (ACC 2011), VOL 4, 2011, 4 : 224 - 228
- [6] Application of HHM in Risk Identification of Tunnel Project [J]. MECHANICAL AND ELECTRONICS ENGINEERING III, PTS 1-5, 2012, 130-134 : 3447 - +
- [8] Government-led rural Infrastructure PPP Project Risk Allocation [J]. PROCEEDINGS OF THE FIRST INTERNATIONAL SYMPOSIUM ON MANAGEMENT AND SOCIAL SCIENCES (ISMSS 2019), 2019, 309 : 180 - 185
- [10] RISK ALLOCATION IN PUBLIC-PRIVATE PARTNERSHIP (PPP) PROJECT: A REVIEW ON RISK FACTORS [J]. INTERNATIONAL JOURNAL OF SUSTAINABLE CONSTRUCTION ENGINEERING AND TECHNOLOGY, 2011, 2 (02): : 8 - 16