Risk Identification and Allocation of the Utility Tunnel PPP Project

被引:4
|
作者
Mao, Yihua [1 ]
Zhang, Yaoyao [1 ]
机构
[1] Zhejiang Univ, Inst Civil Engn Management, Hangzhou 310000, Zhejiang, Peoples R China
关键词
utility tunnel; PPP; risk identification; risk allocation;
D O I
10.1063/1.4982497
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Based on the literature study of utility tunnel, 60 project risk factors are identified through expert interviews and classified into macro level risks, meso level risks and micro level risks according to the risk level. At the same time, we study the risk-sharing mechanism, then adopt the control force principle, the cognition principle and the profit principle to allocate risk, and put forward the pertinent risk countermeasure in order to provide the reference for the future practice and theory research.
引用
收藏
页数:8
相关论文
共 50 条
  • [31] System Conditions of UHV GIL in Sutong Utility Tunnel Project
    Ban L.
    Sun G.
    Xiang Z.
    Wang N.
    Ge D.
    Xu W.
    Dianwang Jishu/Power System Technology, 2020, 44 (06): : 2386 - 2392
  • [32] Risk perception in PPP infrastructure project financing in India
    Gupta, Pankaj Kumar
    Verma, Harender
    JOURNAL OF FINANCIAL MANAGEMENT OF PROPERTY AND CONSTRUCTION, 2020, 25 (03) : 347 - 369
  • [33] Research on Risk Management of PPP Financing Project in China
    Su, Yunshan
    ICCREM 2017: PREFABRICATED BUILDINGS, INDUSTRIALIZED CONSTRUCTION, AND PUBLIC-PRIVATE PARTNERSHIPS, 2017, : 299 - 308
  • [34] Research on Risk Sharing of EOD plus PPP Project
    Li, Hongbing
    Xiong, Guodi
    CARBON PEAK AND NEUTRALITY STRATEGIES OF THE CONSTRUCTION INDUSTRY (ICCREM 2022), 2022, : 699 - 708
  • [35] Impact of alternative tunnelling procedure on contractual allocation of ground risk at S 7 motorway Tunnel Project Rudersdorf
    Sellner P.J.
    Pacher W.
    Weinmar W.
    Moser H.
    Monsberger Y.
    Geomechanik und Tunnelbau, 2021, 14 (05): : 547 - 556
  • [36] Study of Risk Allocation in PPP Projects Based on Altruistic Theory
    Wang, Yinglin
    Liu, Jicai
    Hwang, Bon-Gang
    2016 INTERNATIONAL CONFERENCE ON LOGISTICS, INFORMATICS AND SERVICE SCIENCES (LISS' 2016), 2016,
  • [37] A Principal-Agent Theory Perspective on PPP Risk Allocation
    Shrestha, Asheem
    Tamosaitiene, Jolanta
    Martek, Igor
    Hosseini, M. Reza
    Edwards, David J.
    SUSTAINABILITY, 2019, 11 (22)
  • [38] Allocation Model of Macro Economy Risk Associated With PPP Projects
    Xu YeLin
    Cheng Hu
    CRIOCM2009: INTERNATIONAL SYMPOSIUM ON ADVANCEMENT OF CONSTRUCTION MANAGEMENT AND REAL ESTATE, VOLS 1-6, 2009, : 2492 - 2496
  • [39] Developing a Fuzzy Risk Allocation Model for PPP Projects in China
    Xu, Yelin
    Chan, Albert P. C.
    Yeung, John F. Y.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2010, 136 (08) : 894 - 903
  • [40] The Research on Equity Allocation of PPP Project Company Based on Cooperative Game Model
    Li Xiaoguang
    Hao Shengyue
    Ren Xu
    PROCEEDINGS OF THE THIRD INTERNATIONAL SYMPOSIUM - MANAGEMENT, INNOVATION & DEVELOPMENT, BKS ONE & TWO, 2016, : 1150 - 1155