共 50 条
- [41] A special resource constrained project scheduling problem: model update and ant colony optimization solving [J]. PROCEEDINGS OF THE 2015 4TH NATIONAL CONFERENCE ON ELECTRICAL, ELECTRONICS AND COMPUTER ENGINEERING ( NCEECE 2015), 2016, 47 : 1601 - 1606
- [43] Resource allocation and scheduling problem based on genetic algorithm and ant colony optimization [J]. ADVANCES IN KNOWLEDGE DISCOVERY AND DATA MINING, PROCEEDINGS, 2007, 4426 : 879 - +
- [44] Robust scheduling and optimization for resource-constrained project scheduling problem with transfer times [J]. Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2023, 29 (12): : 4191 - 4205
- [45] Resource-constrained project scheduling problem with reworking [J]. Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2019, 25 (11): : 2762 - 2774
- [46] A SURVEY ON THE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM [J]. IIE TRANSACTIONS, 1995, 27 (05) : 574 - 586
- [50] Genetic Algorithm Parameters Tuning for Resource-constrained Project Scheduling Problem [J]. ADVANCES IN MATERIALS, MACHINERY, ELECTRONICS II, 2018, 1955