A two-stage hybrid robust-stochastic day-ahead scheduling of transactive microgrids considering the possibility of main grid disconnection

被引:31
|
作者
Nourollahi, Ramin [1 ]
Salyani, Pouya [1 ]
Zare, Kazem [1 ]
Razzaghi, Reza [1 ]
机构
[1] Univ Tabriz, Fac Elect & Comp Engn, Tabriz 5166615813, Iran
关键词
MG; Resiliency; Robust-stochastic; ITMG; Interconnected transactive MGs; NETWORKED-MICROGRIDS; ENERGY MANAGEMENT; RESILIENCE; ENHANCEMENT; STRATEGIES;
D O I
10.1016/j.ijepes.2021.107701
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
The interconnected transactive MGs (ITMGs) concept is an efficient way for economical operation of MGs. For power systems under the danger of stochastic disasters, a priority should be given to the resiliency enhancement of these ITMGs to have the highest restoration in the times of disconnection from the main grid. This paper introduces a two-stage hybrid stochastic programming/robust optimization (SP/RO) day-ahead scheduling of ITMGs that takes into account the possibility of disconnection from the main grid for several hours. The proposed resiliency-oriented scheduling in this paper is a two-stage mixed-integer linear optimization problem and aims to reduce the operation cost of the whole ITMG. Furthermore, the excess power can be traded among MGs apart from the available power of renewable resources, dispatched power of storage and dispatchable units, and demand response programs. Thus, this scheduling needs to consider the optimal hourly transactive energy among the MGs in both normal and grid disconnected modes of the ITMG. The load curtailment and demand response programs are the last options for maintaining the balance in the conventional structure of MGs that this paper utilizes for ITMG. Obtained results showed that load curtailment of the ITMG is limited by the implementation of transactive energy between MGs. Furthermore, the reduction in renewable and dispatchable generation capacity and their impact on transactive energy and demand response programs during resiliency is discussed. Also, to enhance the conservativeness and to consider the worst cases in this scheduling, the uncertainties in the start time of the islanding and its duration are considered in the problem.
引用
收藏
页数:13
相关论文
共 50 条
  • [31] Two-Stage Day-Ahead and Intra-Day Rolling Optimization Scheduling of Container Integrated Port Energy System
    Zhou, Siyi
    Yang, Huanhong
    Huang, Wentao
    Zhou, Ze
    Jiao, Wei
    Yang, Zhenyu
    [J]. Shanghai Jiaotong Daxue Xuebao/Journal of Shanghai Jiaotong University, 2024, 58 (09): : 1357 - 1369
  • [32] Robust Regret Based Two-stage Clearing Optimization of Day-ahead and Intra-day Markets with Wind Power
    Jiang, Yuewen
    Chen, Meisen
    Wen, Buying
    [J]. Dianli Xitong Zidonghua/Automation of Electric Power Systems, 2019, 43 (09): : 59 - 67
  • [33] Multi-Time-Scale Rolling Optimal Dispatch for AC/DC Hybrid Microgrids With Day-Ahead Distributionally Robust Scheduling
    Qiu, Haifeng
    Gu, Wei
    Xu, Yinliang
    Zhao, Bo
    [J]. IEEE TRANSACTIONS ON SUSTAINABLE ENERGY, 2019, 10 (04) : 1653 - 1663
  • [34] Enhancing the Resilience of Hybrid Microgrids by Minimizing the Maximum Relative Regret in Two-Stage Stochastic Scheduling
    Parast, Mahsa Ebadat
    Nazari, M. Hassan
    Hosseinian, S. Hossien
    [J]. IEEE ACCESS, 2022, 10 : 66198 - 66212
  • [35] Two-Stage Hybrid Deep Learning With Strong Adaptability for Detailed Day-Ahead Photovoltaic Power Forecasting
    Li, Jianjing
    Zhang, Chenghui
    Sun, Bo
    [J]. IEEE TRANSACTIONS ON SUSTAINABLE ENERGY, 2023, 14 (01) : 193 - 205
  • [36] Two-stage Clearing Model for Day-ahead Electricity Market Considering Impact of Carbon Emissions Trading Market
    Lu, Zhilin
    Liu, Mingbo
    Shang, Nan
    Chen, Zheng
    Zhang, Yan
    Huang, Guori
    [J]. Dianli Xitong Zidonghua/Automation of Electric Power Systems, 2022, 46 (10): : 159 - 170
  • [37] Two-stage self-scheduling of battery swapping station in day-ahead energy and frequency regulation markets
    Wu, Chuantao
    Lin, Xiangning
    Sui, Quan
    Wang, Zhixun
    Feng, Zhongnan
    Li, Zhengtian
    [J]. APPLIED ENERGY, 2021, 283
  • [38] Two-stage stochastic programming for risk-aware scheduling of energy hubs participating in day-ahead and real-time electricity markets
    Jordehi, A. Rezaee
    [J]. SUSTAINABLE CITIES AND SOCIETY, 2022, 81
  • [39] A two-stage stochastic programming framework for risk-based day-ahead operation of a virtual power plant
    Emarati, Mohammadreza
    Keynia, Farshid
    Rashidinejad, Masoud
    [J]. INTERNATIONAL TRANSACTIONS ON ELECTRICAL ENERGY SYSTEMS, 2020, 30 (03)
  • [40] Day-ahead and intra-day two-stage low-carbon economic scheduling method considering multi-form energy-intensive load
    Yuan, Zhijun
    Wang, Yibo
    Xu, Yueyang
    Liu, Chuang
    Ge, Weichun
    Cai, Guowei
    Zhou, Jianing
    Sun, Ao
    Liu, Xin
    Li, Baihe
    [J]. FRONTIERS IN ENERGY RESEARCH, 2023, 11