共 50 条
- [1] Two-Stage Stochastic Power Generation Scheduling in Microgrids [J]. 2014 IEEE 27TH CANADIAN CONFERENCE ON ELECTRICAL AND COMPUTER ENGINEERING (CCECE), 2014,
- [4] Two-stage Robust Optimal Scheduling for Microgrids [J]. 2021 8TH INTERNATIONAL FORUM ON ELECTRICAL ENGINEERING AND AUTOMATION, IFEEA, 2021, : 505 - 510
- [6] Scheduling algorithms for two-stage reentrant hybrid flow shops: minimizing makespan under the maximum allowable due dates [J]. The International Journal of Advanced Manufacturing Technology, 2009, 42 : 963 - 973
- [7] Scheduling algorithms for two-stage reentrant hybrid flow shops: minimizing makespan under the maximum allowable due dates [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 42 (9-10): : 963 - 973
- [9] Minimizing makespan in a two-stage hybrid flow shop scheduling problem with open shop in one stage [J]. Applied Mathematics-A Journal of Chinese Universities, 2013, 28 : 358 - 368