Enhancing the Resilience of Hybrid Microgrids by Minimizing the Maximum Relative Regret in Two-Stage Stochastic Scheduling

被引:4
|
作者
Parast, Mahsa Ebadat [1 ]
Nazari, M. Hassan [1 ]
Hosseinian, S. Hossien [1 ]
机构
[1] Amirkabir Univ Technol, Dept Elect Engn, Tehran 1587544131, Iran
关键词
Resilience; Costs; Optimization; Uncertainty; Stochastic processes; Linear programming; Robustness; Hybrid microgrids; resilience enhancement; stochastic optimization; minimax regret; optimality robustness; POWER-SYSTEM RESILIENCE; OPTIMIZATION; ENERGY;
D O I
10.1109/ACCESS.2022.3183788
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Occurrence of severe events with high-impact and low-probability (HILP) can cause significant disturbances to power grids. The strength of the system to withstand such HILP events is interpreted as system resilience. This paper proposes a novel approach for hybrid AC/DC microgrids with the aim of resilience enhancement and based on a linear stochastic two-stage scenario-based minimax relative regret (LSTS-MMRR) optimization according to the optimality robustness concept. Photovoltaic arrays and wind turbines, microturbines, and energy storage systems are scheduled based on the proposed approach in microgrids. Considering the uncertainty of emergency duration due to disruption from the upstream grid, the optimization problem is decomposed into standard and critical stochastic situations. This work also quantifies the importance of uncertainty with the well-known quantities named Value of Stochastic Solution (VSS) and Expected Value of Perfect Information (EVPI). For both normal and emergency circumstances, exclusive objective function and constraints are considered. Meanwhile, time-related variables maintain their continuity between normal and emergency circumstances. Therefore, the proposed approach minimized the maximum relative regret of objective function through defined scenarios. The proposed technique is compared with two common methods in resilience enhancement issues, and its effectiveness is demonstrated through an analysis of the VSS and EVPI.
引用
收藏
页码:66198 / 66212
页数:15
相关论文
共 50 条
  • [1] Two-Stage Stochastic Power Generation Scheduling in Microgrids
    Eajal, A. A.
    El-Saadany, E. F.
    Elrayani, Yousef
    Ponnambalam, K.
    [J]. 2014 IEEE 27TH CANADIAN CONFERENCE ON ELECTRICAL AND COMPUTER ENGINEERING (CCECE), 2014,
  • [2] Enhancing the Resilience of Operational Microgrids Through a Two-Stage Scheduling Strategy Considering the Impact of Uncertainties
    Younesi, Abdollah
    Shayeghi, Hossein
    Siano, Pierluigi
    Safari, Amin
    Alhelou, Hassan Haes
    [J]. IEEE ACCESS, 2021, 9 : 18454 - 18464
  • [3] Minimizing makespan in two-stage hybrid cross docking scheduling problem
    Chen, Feng
    Song, Kailei
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2009, 36 (06) : 2066 - 2073
  • [4] Two-stage Robust Optimal Scheduling for Microgrids
    Duan, Jiandong
    Cheng, Ran
    Wang, Jing
    [J]. 2021 8TH INTERNATIONAL FORUM ON ELECTRICAL ENGINEERING AND AUTOMATION, IFEEA, 2021, : 505 - 510
  • [5] Two-Stage Robust Stochastic Model Scheduling for Transactive Energy Based Renewable Microgrids
    Daneshvar, Mohammadreza
    Mohammadi-Ivatloo, Behnam
    Zare, Kazem
    Asadi, Somayeh
    [J]. IEEE TRANSACTIONS ON INDUSTRIAL INFORMATICS, 2020, 16 (11) : 6857 - 6867
  • [6] Scheduling algorithms for two-stage reentrant hybrid flow shops: minimizing makespan under the maximum allowable due dates
    Hyun-Seon Choi
    Hyung-Won Kim
    Dong-Ho Lee
    Junggee Yoon
    Chang Yeon Yun
    Kevin B. Chae
    [J]. The International Journal of Advanced Manufacturing Technology, 2009, 42 : 963 - 973
  • [7] Scheduling algorithms for two-stage reentrant hybrid flow shops: minimizing makespan under the maximum allowable due dates
    Choi, Hyun-Seon
    Kim, Hyung-Won
    Lee, Dong-Ho
    Yoon, Junggee
    Yun, Chang Yeon
    Chae, Kevin B.
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 42 (9-10): : 963 - 973
  • [8] Minimizing makespan in a two-stage hybrid flow shop scheduling problem with open shop in one stage
    Dong Jian-ming
    Hu Jue-liang
    Chen Yong
    [J]. APPLIED MATHEMATICS-A JOURNAL OF CHINESE UNIVERSITIES SERIES B, 2013, 28 (03) : 358 - 368
  • [9] Minimizing makespan in a two-stage hybrid flow shop scheduling problem with open shop in one stage
    Jian-ming Dong
    Jue-liang Hu
    Yong Chen
    [J]. Applied Mathematics-A Journal of Chinese Universities, 2013, 28 : 358 - 368
  • [10] Minimizing makespan in a two-stage hybrid flow shop scheduling problem with open shop in one stage
    DONG Jianming
    HU Jueliang
    CHEN Yong
    [J]. AppliedMathematics:AJournalofChineseUniversities(SeriesB), 2013, 28 (03) : 358 - 368