The transportation planning to the new panel of the longwall mechanized equipment in Tuncbilek Coal Mine

被引:0
|
作者
Akdas, H [1 ]
Yavuz, M [1 ]
Çelik, R [1 ]
机构
[1] Osmangazi Univ, Min Engn Dept, Bademlik, Eskisehir, Turkey
关键词
D O I
暂无
中图分类号
TD [矿业工程];
学科分类号
0819 ;
摘要
Tuncbilek Lignite reserve located at west part of Turkey is one of the important lignite deposites. Recently, pilot full mechanized longwall application has started to increase production in Omerler Coal Mine in this district. The mechanized longwall equipment was transferred to the new panel because first panel was mined out. In order to follow all activities during face move, the Critical Path Analysis was used to evaluate the transportation project. The transportation of the mechanized system was completed in 84 workdays as total duration time. Fifteen activities were defined as critical activity. It could be concluded that the longwall face move would be completed shorter duration time by effective planning of all activities and pre-move organization in this mine for future.
引用
收藏
页码:11 / 14
页数:4
相关论文
共 31 条
  • [1] Moving procedures to new panel for full mechanized longwall equipment in GLI Omerler underground coal mine
    Akdas, H.
    Celik, R.
    [J]. PROCEEDINGS OF THE 20TH INTERNATIONAL MINING CONGRESS AND EXHIBITION OF TURKEY, NO 132, 2007, : 39 - 47
  • [2] Discontinuous Modeling of Roof Strata Caving in a Mechanized Longwall Mine in Tabas Coal Mine
    Arasteh, Hossein
    Esmaeili, Kamran
    Saeedi, Gholamreza
    Farsangi, Mohammad Ali Ebrahimi
    [J]. INTERNATIONAL JOURNAL OF GEOMECHANICS, 2022, 22 (05)
  • [3] Investigating the shape and size distribution of dust in mechanized longwall method in Tabas coal mine
    Arasteh, Hossein
    Saeedi, Gholamreza
    [J]. HUMAN AND ECOLOGICAL RISK ASSESSMENT, 2017, 23 (01): : 28 - 39
  • [4] Study of optimum dimensioning of abutment pillars in longwall mining of GL(I)over-dot Tuncbilek Coal Mine
    Önce, G
    Taskin, F
    [J]. ROCK MECHANICS: A CHALLENGE FOR SOCIETY, 2001, : 843 - 848
  • [5] Evaluation of the Effect of Coal Seam Dip on Stress Distribution and Displacement around the Mechanized Longwall Panel
    Damghani, M.
    Rahmannejad, R.
    Najafi, M.
    [J]. JOURNAL OF MINING SCIENCE, 2019, 55 (05) : 733 - 742
  • [6] Evaluation of the Effect of Coal Seam Dip on Stress Distribution and Displacement around the Mechanized Longwall Panel
    M. Damghani
    R. Rahmannejad
    M. Najafi
    [J]. Journal of Mining Science, 2019, 55 : 733 - 742
  • [7] Stress Distribution Around Mechanized Longwall Face at Deep Mining in Quang Ninh Underground Coal Mine
    Bui, Manh Tung
    Le, Tien Dung
    Vo, Trong Hung
    [J]. INZYNIERIA MINERALNA-JOURNAL OF THE POLISH MINERAL ENGINEERING SOCIETY, 2021, (02): : 167 - 176
  • [8] Influence of geotechnical factors on gas flow experienced in a UK longwall coal mine panel
    Whittles, DN
    Lowndes, IS
    Kingman, SW
    Yates, C
    Jobling, S
    [J]. INTERNATIONAL JOURNAL OF ROCK MECHANICS AND MINING SCIENCES, 2006, 43 (03) : 369 - 387
  • [9] Investigation of Fault Displacement Evolution During Extraction in Longwall Panel in an Underground Coal Mine
    Hongwei Wang
    Sheng Xue
    Ruiming Shi
    Yaodong Jiang
    Weili Gong
    Lingtao Mao
    [J]. Rock Mechanics and Rock Engineering, 2020, 53 : 1809 - 1826
  • [10] Investigation of Fault Displacement Evolution During Extraction in Longwall Panel in an Underground Coal Mine
    Wang, Hongwei
    Xue, Sheng
    Shi, Ruiming
    Jiang, Yaodong
    Gong, Weili
    Mao, Lingtao
    [J]. ROCK MECHANICS AND ROCK ENGINEERING, 2020, 53 (04) : 1809 - 1826