Moving procedures to new panel for full mechanized longwall equipment in GLI Omerler underground coal mine

被引:0
|
作者
Akdas, H. [1 ]
Celik, R. [1 ]
机构
[1] Eskisehir Osmangazi Univ, MMF, Eskisehir, Turkey
关键词
D O I
暂无
中图分类号
TD [矿业工程];
学科分类号
0819 ;
摘要
In this paper, firstly, the moving procedures of the full mechanized longwall equipment, in GLI Omerler Underground Coal Mine, to a new panel are introduced. The moving procedures have been examined in three main steps, which are preparation activities, dismantling - withdrawal of the equipment, moving and mounting activities in the new panel. Also, technical problems encountered during the moving of such complicated equipment have been mentioned. The currently employed dismantling - withdrawal practice is being realized under poor roof conditions and in the presence of high water income, causing some technical problems. Finally, considering the problems briefly mentioned above, it is suggested that a new method for the preparation and a new dismantling - withdrawal should be employed.
引用
收藏
页码:39 / 47
页数:9
相关论文
共 8 条
  • [1] The transportation planning to the new panel of the longwall mechanized equipment in Tuncbilek Coal Mine
    Akdas, H
    Yavuz, M
    Çelik, R
    [J]. MINE PLANNING AND EQUIPMENT SELECTION 2000, 2000, : 11 - 14
  • [2] Stress Distribution Around Mechanized Longwall Face at Deep Mining in Quang Ninh Underground Coal Mine
    Bui, Manh Tung
    Le, Tien Dung
    Vo, Trong Hung
    [J]. INZYNIERIA MINERALNA-JOURNAL OF THE POLISH MINERAL ENGINEERING SOCIETY, 2021, (02): : 167 - 176
  • [3] Investigation of Fault Displacement Evolution During Extraction in Longwall Panel in an Underground Coal Mine
    Hongwei Wang
    Sheng Xue
    Ruiming Shi
    Yaodong Jiang
    Weili Gong
    Lingtao Mao
    [J]. Rock Mechanics and Rock Engineering, 2020, 53 : 1809 - 1826
  • [4] Investigation of Fault Displacement Evolution During Extraction in Longwall Panel in an Underground Coal Mine
    Wang, Hongwei
    Xue, Sheng
    Shi, Ruiming
    Jiang, Yaodong
    Gong, Weili
    Mao, Lingtao
    [J]. ROCK MECHANICS AND ROCK ENGINEERING, 2020, 53 (04) : 1809 - 1826
  • [5] Computational Fluid Dynamics Modeling of a Methane Gas Explosion in a Full-Scale, Underground Longwall Coal Mine
    Aditya Juganda
    Claire Strebinger
    Jürgen. F. Brune
    Gregory E. Bogin
    [J]. Mining, Metallurgy & Exploration, 2022, 39 : 897 - 916
  • [6] Computational Fluid Dynamics Modeling of a Methane Gas Explosion in a Full-Scale, Underground Longwall Coal Mine
    Juganda, Aditya
    Strebinger, Claire
    Brune, Jurgen F.
    Bogin, Gregory E. Jr Jr
    [J]. MINING METALLURGY & EXPLORATION, 2022, 39 (03) : 897 - 916
  • [7] New approaches for increasing the incubation period of spontaneous combustion of coal in an underground mine panel
    Tripathi, D. D.
    [J]. FIRE TECHNOLOGY, 2008, 44 (02) : 185 - 198
  • [8] New Approaches for Increasing the Incubation Period of Spontaneous Combustion of Coal in an Underground Mine Panel
    D. D. Tripathi
    [J]. Fire Technology, 2008, 44 : 185 - 198