共 50 条
- [2] Stress Distribution Around Mechanized Longwall Face at Deep Mining in Quang Ninh Underground Coal Mine [J]. INZYNIERIA MINERALNA-JOURNAL OF THE POLISH MINERAL ENGINEERING SOCIETY, 2021, (02): : 167 - 176
- [4] Support Analysis of Main Tunnels in Tabas Mechanized Parvadeh Mine at Intersection with Coal Seam [J]. JOURNAL OF MINING AND ENVIRONMENT, 2021, 12 (03): : 711 - 724
- [5] Reliability-based maintenance scheduling of powered supports in Tabas mechanized coal mine [J]. JOURNAL OF MINING AND ENVIRONMENT, 2014, 5 (02): : 113 - 120
- [6] The transportation planning to the new panel of the longwall mechanized equipment in Tuncbilek Coal Mine [J]. MINE PLANNING AND EQUIPMENT SELECTION 2000, 2000, : 11 - 14
- [8] Respirable dust detection and optimization of dust prevention measures in fully mechanized face of coal mine [J]. 2019 INTERNATIONAL CONFERENCE ON ADVANCES IN CIVIL ENGINEERING, ENERGY RESOURCES AND ENVIRONMENT ENGINEERING, 2019, 330
- [9] Moving procedures to new panel for full mechanized longwall equipment in GLI Omerler underground coal mine [J]. PROCEEDINGS OF THE 20TH INTERNATIONAL MINING CONGRESS AND EXHIBITION OF TURKEY, NO 132, 2007, : 39 - 47