共 50 条
- [41] Project time-cost trade-off scheduling: a hybrid optimization approach [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 50 (5-8): : 811 - 822
- [43] A fuzzy time-cost trade-off problem with credibility theory concepts [J]. PROCEEDING OF THE SEVENTH INTERNATIONAL CONFERENCE ON INFORMATION AND MANAGEMENT SCIENCES, 2008, 7 : 258 - 262
- [47] Multiobjective Optimization of Time-Cost Trade-Off Using Harmony Search [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2010, 136 (06): : 711 - 716
- [48] Time-cost trade-off in PERT networks using a genetic algorithm [J]. 2004 47TH MIDWEST SYMPOSIUM ON CIRCUITS AND SYSTEMS, VOL III, CONFERENCE PROCEEDINGS, 2004, : 57 - 60
- [49] Fuzzy random time-cost trade-off model based on the philosophy of dependent-chance programming [J]. Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2013, 33 (04): : 886 - 892
- [50] Time-cost trade-off optimization with a new initial population approach [J]. Teknik Dergi/Technical Journal of Turkish Chamber of Civil Engineers, 2019, 30 (06): : 9561 - 9580