Risk-Based Approach to Predict the Cost Performance of Modularization in Construction Projects

被引:11
|
作者
Abdul Nabi, Mohamad [1 ]
El-adaway, Islam H. [2 ,3 ,4 ]
机构
[1] Missouri Univ Sci & Technol, Dept Civil Architectural & Environm Engn, Rolla, MO 65409 USA
[2] Missouri Univ Sci & Technol, Construct Engn & Management, Rolla, MO 65409 USA
[3] Missouri Univ Sci & Technol, Missouri Consortium Construct Innovat, Dept Civil Architectural & Environm Engn, Rolla, MO 65409 USA
[4] Missouri Univ Sci & Technol, Dept Engn Management & Syst Engn, Rolla, MO 65409 USA
关键词
Modularization; Proactive risk management; Decision-support tool; Modular risks; MANAGEMENT; PREFABRICATION; UNCERTAINTY; SYSTEM; SITE;
D O I
10.1061/(ASCE)CO.1943-7862.0002159
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The lack of proper management of the unique modular risks hinders the construction industry from maximizing the potential benefits associated with the use of modularization. Capturing the full cost benefits of modularized processes requires careful consideration of different aspects related to material, design, technology, logistics, installation, and so forth. Although many previous research efforts provided models to assess the feasibility of modularization in construction projects, no previous study developed a risk-based approach to assess the impact of adopting modular approaches on the cost performance of construction projects. This paper fills this knowledge gap. The authors followed an interrelated multistep research methodology. First, 50 modular risks were identified based on an extensive analysis of the literature conducted in a previous research study. Second, an industry survey was conducted in which 48 construction professionals-with an average of 24.25 years experience in construction operations and 13.6 years experience in modular construction-examined and assessed the impact of modular risks on cost performance. Third, integrated statistical and mathematical techniques-including distribution fitting-were utilized to develop a predictive model that (1) maps the 50 modular risks under investigation to cost performance data collected from 56 modular construction projects, and, consequently, (2) computes the associated cost saving and/or growth. The proposed model was verified using extreme condition tests, surprise behavior test, and sensitivity analysis, and was validated by industry experts. The authors provide guidelines for using the proposed model by industry practitioners. The developed model allows for maximized use of available project information to enable a reliable a priori cost assessment for the modularization processes throughout the different project phases. This is particularly important in the case of varying conditions over the project lifecycle. The developed model helps project stakeholders identify cost enablers and barriers that are interrelated with modularization processes. Accordingly, corrective actions and mitigation plans can be established. This research provides improved practices for decision-making, risk management, and project team alignment to maximize the cost benefits of modularization in construction projects.
引用
收藏
页数:16
相关论文
共 50 条
  • [21] Prediction of Cost Overrun Risk in Construction Projects
    Plebankiewicz, Edyta
    Wieczorek, Damian
    [J]. SUSTAINABILITY, 2020, 12 (22) : 1 - 15
  • [22] Risk management in construction projects: a knowledge-based approach
    Federico Serpella, Alfredo
    Ferrada, Ximena
    Howard, Rodolfo
    Rubio, Larissa
    [J]. SELECTED PAPERS FROM THE 27TH IPMA (INTERNATIONAL PROJECT MANAGEMENT ASSOCIATION), 2014, 119 : 653 - 662
  • [23] Risk-Based Metanetwork Modeling for Sustainable Project Performance in International Construction
    Liu, Mei
    Chong, Heap-Yih
    Liao, Pin-Chao
    Ganbat, Tsenguun
    [J]. JOURNAL OF INFRASTRUCTURE SYSTEMS, 2021, 27 (03)
  • [24] Risk-Based Prioritization of Construction Inspection
    Yuan, Chenxi
    Park, Jaehyun
    Xu, Xin
    Cai, Hubo
    Abraham, Dulcy M.
    Bowman, Mark D.
    [J]. TRANSPORTATION RESEARCH RECORD, 2018, 2672 (26) : 96 - 105
  • [25] A Risk-based Approach to Managing Performance-based Maintenance Contracts
    Jing, Huayi
    Tang, Loon Ching
    [J]. QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 2017, 33 (04) : 853 - 865
  • [26] A risk-based approach for evaluation of hygiene performance at pig slaughter
    Bollerslev, Anne Mette
    Nauta, Maarten
    Hald, Tine
    Hansen, Tina Beck
    Aabo, Soren
    [J]. FOOD CONTROL, 2017, 75 : 116 - 125
  • [27] Adopting a risk-based approach
    Yohe, Gary
    Leichenko, Robin
    [J]. CLIMATE CHANGE ADAPTATION IN NEW YORK CITY: BUILDING A RISK MANAGEMENT RESPONSE, 2010, 1196 : 29 - 40
  • [28] Public-Private Partnerships: A Fresh Risk-Based Approach to Water Sector Projects
    Lima, Sonia
    Brochado, Ana
    Marques, Rui Cunha
    [J]. INFRASTRUCTURES, 2023, 8 (06)
  • [29] Cost Overrun Risk Assessment and Prediction in Construction Projects: A Bayesian Network Classifier Approach
    Ashtari, Mohammad Amin
    Ansari, Ramin
    Hassannayebi, Erfan
    Jeong, Jaewook
    [J]. BUILDINGS, 2022, 12 (10)
  • [30] Strategy development of contractor with Contractor Full Pre-Finance (CPF) scheme using risk-based approach to increase cost performance of toll road development projects
    Isvara, Wisnu
    Ichsan, Mohammad
    Muhammad, Farras Ammar
    Handibyanto, Jodi Noor
    Abdinagoro, Sri Bramantoro
    [J]. COGENT ENGINEERING, 2023, 10 (01):