A Risk-based Approach to Managing Performance-based Maintenance Contracts

被引:4
|
作者
Jing, Huayi [1 ]
Tang, Loon Ching [1 ]
机构
[1] Natl Univ Singapore, Dept Ind & Syst Engn, 1 Engn Dr 2, Singapore 119260, Singapore
关键词
risk-based approach; performance-based maintenance contracts; contract management; spare parts control; PARTS INVENTORY; MULTIECHELON; AVAILABILITY; RELIABILITY; LOGISTICS; SUBJECT; SYSTEMS;
D O I
10.1002/qre.2062
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The global trend towards performance-based maintenance contracting has presented new challenges to maintenance service providers as they are compensated or penalized based on performance outcomes instead of time and materials consumed during maintenance service. The problem becomes more complex when uncertainties exist in reliability performance and maintenance activities of technical systems. In this paper, a general framework for managing performance-based maintenance contract under risks is proposed. We illustrate our approach with an application in a multi-echelon multi-system spare parts control problem. Several different performance measures are considered and a probabilistic constrained optimization problem is formulated from the perspective of the service provider. Hybrid simulation/analytic heuristics are proposed to solve the problem based on the monotonic properties of performance measures. This approach is flexible and can be applied to a wide range of problems with similar properties. Numerical example shows that the probability of violating performance requirements is high if the risk is overlooked. We also provide guidelines on how to apply this approach in practice. Copyright (C) 2016 JohnWiley & Sons, Ltd.
引用
收藏
页码:853 / 865
页数:13
相关论文
共 50 条
  • [1] Risk-based dependability approach to maintenance performance measurement
    Soderholm, Peter
    Norrbin, Per
    [J]. JOURNAL OF QUALITY IN MAINTENANCE ENGINEERING, 2013, 19 (03) : 316 - +
  • [2] Framework Development of Performance-Based Striping Maintenance Contracts
    Shrestha, Kishor
    Shrestha, Pramen P.
    [J]. JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2020, 12 (02)
  • [3] Technology investment effects in performance-based maintenance contracts
    Ulloa, R. S.
    Mac Cawley, A. F.
    Santelices, G. A.
    Pascual, R.
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2018, 56 (07) : 2628 - 2645
  • [4] Risk-based model for valuation of performance-specified pavement maintenance contracts
    Damnjanovic, Ivan
    Zhang, Zhanmin
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2008, 134 (07): : 492 - 500
  • [5] Embracing complexity in performance-based contracts for road maintenance
    Schoenmaker, Rob
    de Bruijn, Hans
    [J]. INTERNATIONAL JOURNAL OF PRODUCTIVITY AND PERFORMANCE MANAGEMENT, 2016, 65 (01) : 4 - 24
  • [6] Establishment of urban road maintenance model based on performance-based contracts
    Yang, Jyh-Bin
    Tseng, Chun-Chieh
    Chang, Jia-Ruey
    Liu, Chia-Ming
    [J]. JOURNAL OF THE CHINESE INSTITUTE OF ENGINEERS, 2023, 46 (03) : 208 - 219
  • [7] Optimal Maintenance and Rehabilitation Policies for Performance-Based Road Maintenance Contracts
    Abu Samra, Soliman
    Osman, Hesham
    Hosny, Ossama
    [J]. JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES, 2017, 31 (01)
  • [8] Quantifying the Effectiveness of Performance-Based Pavement Marking Maintenance Contracts
    Geedipally, Srinivas Reddy
    Songchitruksa, Praprut
    Pike, Adam M.
    [J]. TRANSPORTATION RESEARCH RECORD, 2015, (2482) : 23 - 31
  • [9] ADVERSE RISK INCENTIVES AND THE DESIGN OF PERFORMANCE-BASED CONTRACTS
    GRINBLATT, M
    TITMAN, S
    [J]. MANAGEMENT SCIENCE, 1989, 35 (07) : 807 - 822
  • [10] An approach to risk-based budgeting of maintenance costs
    Sihn, W
    Engels-Lindemann, M
    [J]. QRM 2002: PROCEEDINGS OF THE 4TH INTERNATIONAL CONFERENCE ON QUALITY, RELIABILITY, AND MAINTENANCE, 2002, : 227 - 230