Quality cost of material procurement in construction projects

被引:17
|
作者
Sawan, Rema [1 ]
Low, Jwen Fai [2 ]
Schiffauerova, Andrea [2 ]
机构
[1] Concordia Univ, Montreal, PQ, Canada
[2] Masdar Inst Sci & Technol, Masdar City, U Arab Emirates
关键词
Construction; Simulation; Case study; Project management; Novel method; SUPPLY CHAIN DESIGN; OF-QUALITY; SYSTEM; PRODUCTIVITY; MANAGEMENT;
D O I
10.1108/ECAM-04-2017-0068
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose Material procurement constitutes a large share of the overall cost of construction projects. Understanding the factors influencing the cost of quality (COQ) in the procurement process could help identify opportunities for lowering quality cost without compromising quality. The paper aims to discuss these issues. Design/methodology/approach In this paper, a COQ model for the construction material procurement process is developed using the traditional prevention-appraisal-failure (PAF) approach. Using data from a $4bn aluminum smelter construction project, the authors conducted a simulation of the COQ model to evaluate various quality assurance policies. Findings This paper confirms that raising the prevention cost leads to a drop in failure cost as well as COQ for the project studied. While the authors are unable to provide blanket recommendations as the results are derived from a single project case study, it does suggest that construction material procurement processes would benefit from a higher prevention expenditure. And for certain cases where the authors observe a deviation from the traditional Juran's model of COQ - the high appraisal cost in the procurement process - reduction of appraisal expenditure may in fact be more beneficial than its increase. Originality/value The research results suggest that appraisal expenditure should be tailored to each purchase order in order to maximize the total benefits. Additionally, this paper presents the first COQ model developed for the construction material procurement process. Another unique feature of the model is its inclusion of supplier-side costs, which are excluded in the conventional COQ analysis.
引用
收藏
页码:974 / 988
页数:15
相关论文
共 50 条
  • [21] Cost of quality in Dubai: An analytical case study of residential construction projects
    Abdelsalam, Hisham M. E.
    Gad, Medhat M.
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2009, 27 (05) : 501 - 511
  • [22] Payment options in collaborative procurement of major construction projects
    Wamuziri, Sam
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-MANAGEMENT PROCUREMENT AND LAW, 2013, 166 (01) : 12 - 20
  • [23] Quality assurance in low-cost housing construction projects in the metropole
    Rarani, Manelisi
    Fore, Stanley
    CONSTRUCTION MATERIALS AND STRUCTURES, 2014, : 1510 - 1516
  • [24] The analysis on quality-cost of construction process in highway engineering projects
    Xiao Zelin
    PROCEEDINGS OF 2006 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2: COLLABORATION AND DEVELOPMENT IN CONSTRUCTION AND REAL ESTATE, 2006, : 569 - 572
  • [25] A SWOT Analysis of Green Procurement Implementation in Construction Projects
    Bidin, Z. A.
    Bohari, A. A. M.
    Rais, S. L. A.
    Saferi, M. M.
    4TH INTERNATIONAL CONFERENCE ON RESEARCH METHODOLOGY FOR BUILT ENVIRONMENT AND ENGINEERING 2019, 2019, 385
  • [26] Social cost in construction projects
    Celik, Tolga
    Kamali, Saeed
    Arayici, Yusuf
    ENVIRONMENTAL IMPACT ASSESSMENT REVIEW, 2017, 64 : 77 - 86
  • [27] Maturity of procurement units for public construction projects in Indonesia
    Abduh, Muhamad
    Sukardi, Sapto N.
    Wirahadikusumah, Reini D.
    Oktaviani, Cut Z.
    Bahagia, Senator N.
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2023, 23 (13) : 2171 - 2184
  • [28] Design and build procurement of construction projects: Hybrids in Singapore
    Foo, J
    Low, C
    Goh, BH
    Ofori, G
    PROFITABLE PARTNERING IN CONSTRUCTION PROCUREMENT, 1999, : 383 - 392
  • [29] 'Intentional uncertainty' for procurement of innovative technology in construction projects
    Yashiro, T
    PROFITABLE PARTNERING IN CONSTRUCTION PROCUREMENT, 1999, : 419 - 428
  • [30] Material and equipment procurement delays in highway projects in Nepal
    Manavazhi, Mohan R
    Adhikari, Dinesh K
    International Journal of Project Management, 2002, 20 (08) : 627 - 632