Payment options in collaborative procurement of major construction projects

被引:3
|
作者
Wamuziri, Sam [1 ]
机构
[1] Glyndwr Univ, Ctr Management Res, Project Management & Strateg Dev, Wrexham, Wales
关键词
contracts & law; procurement; risk & probability analysis;
D O I
10.1680/mpal.10.00060
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
There are many options available for procurement of construction work. The main differences between the options include the payment mechanisms and risk allocation between the project participants. Payment options include fixed-price contracts, cost-reimbursable contracts and target-cost contracts. Use of collaborative procurement based on target-cost contracts is increasing in construction worldwide. Other innovative arrangements for procurement include early contractor involvement design and build. The key features and risk allocation inherent in different procurement methods are discussed. The characteristics of early contractor involvement contracts are assessed including evaluation of the payment mechanisms in a major rail project. It is concluded that experience of early contractor involvement design and build contracts is still limited. As a consequence, further theoretical research and empirical data analysis are required to collate information which will guide industry in designing effective incentives in collaborative procurement for infrastructure projects.
引用
收藏
页码:12 / 20
页数:9
相关论文
共 50 条
  • [1] How procurement options influence risk management in construction projects
    Osipova, Ekaterina
    Eriksson, Per Erik
    [J]. CONSTRUCTION MANAGEMENT AND ECONOMICS, 2011, 29 (11) : 1149 - 1158
  • [2] Collaborative procurement in construction projects performance measures, Case Study: Partnering in Iranian construction industry
    MohammadHasanzadeh, Sogand
    Hosseinalipour, Mujtaba
    Hafezi, MohammadReza
    [J]. SELECTED PAPERS FROM THE 27TH IPMA (INTERNATIONAL PROJECT MANAGEMENT ASSOCIATION), 2014, 119 : 811 - 818
  • [3] Government Intervention Through Collaborative Approach in Promoting the Adoption of Green Procurement for Construction Projects
    Bidin, Zafikha Aida
    Bohari, Asmah Alia Mohamad
    Khalil, Natasha
    [J]. INTERNATIONAL JOURNAL OF SUSTAINABLE CONSTRUCTION ENGINEERING AND TECHNOLOGY, 2022, 13 (02): : 68 - 81
  • [4] Procurement Benchmarks for Major Transportation Projects
    Zhang, Kunqi
    Erfani, Abdolmajid
    Beydoun, Ousama
    Cui, Qingbin
    [J]. TRANSPORTATION RESEARCH RECORD, 2022, 2676 (11) : 363 - 376
  • [5] Procurement of construction projects in local government
    Wamuziri, S
    Seywright, A
    [J]. PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-MUNICIPAL ENGINEER, 2005, 158 (02) : 145 - 152
  • [6] Social procurement in UK construction projects
    Loosemore, Martin
    [J]. INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2016, 34 (02) : 133 - 144
  • [7] Delay Fees in the Procurement of Construction Projects
    Nystrom, Johan
    Nilsson, Jan-Eric
    Borjesson, Maria
    [J]. JOURNAL OF TRANSPORT ECONOMICS AND POLICY, 2019, 53 : 348 - 363
  • [8] Readiness for lean procurement in construction projects
    Suresh, M.
    Arun Ram Nathan, R. B.
    [J]. CONSTRUCTION INNOVATION-ENGLAND, 2020, 20 (04): : 587 - 608
  • [9] Procurement and Governance Choices for Collaborative Infrastructure Projects
    Chen, Le
    Manley, Karen
    Lewis, Joanne
    Helfer, Fernanda
    Widen, Kristian
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2018, 144 (08)
  • [10] EXPLORING LEGITIMACY IN MAJOR PUBLIC PROCUREMENT PROJECTS
    Russell, Colette
    Meehan, Joanne
    [J]. JOURNAL OF PUBLIC PROCUREMENT, 2014, 14 (04) : 495 - 537