The "direct disposal of spent fuel" as a part of the current German reference concept was developed as an alternative to spent fuel reprocessing and vitrified HLW disposal. The technical facilities necessary for the implementation of this part of the reference concept, the so called POLLUX concept, i.e. interim storage buildings for casks containing spent fuel, a pilot conditioning facility, and a special cask "POLLUX" for final disposal have been built. With view to a geological salt formation all handling procedures for the direct disposal of spent fuel were tested aboveground in full-scale test facilities. To optimise the reference concept, all operational steps have been reviewed for possible improvements. The two additional concepts for the direct disposal of SF are the BSK 3 concept and the DIREGT concept. Both concepts rely on borehole emplacement technology, vertical boreholes for the BSK 3 concept und horizontal boreholes for the DIREGT concept. Supported by the EU and the German Federal Ministry of Economics and Technology (BMWi), DBE TECHNOLOGY built an aboveground full-scale test facility to simulate all relevant handling procedures for the BSK 3 disposal concept. GNS (Company for Nuclear Service), representing the German utilities, provided the main components and its know-how concerning cask design and manufacturing. The test program was concluded recently after more than 1.000 emplacement operations had been performed successfully. The BSK 3 emplacement system in total comprises an emplacement device, a borehole lock, a transport cart, a transfer cask which will shuttle between the aboveground conditioning facility and the underground repository, and the BSK 3 canister itself, designed to contain the fuel rods of three PWR-fuel assemblies with a total of about 1.6 tHM. The BSK 3 concept simplifies the operation of the repository because the handling procedures and techniques can also be applied for the disposal of reprocessing residues. In addition to this, the feasibility of the direct disposal of transport and storage casks, the so-called "DIREGT concept", is being investigated. The implementation of this concept would avoid the necessity to separate fuel rods from structural parts and to procure custom-made final disposal casks. All investigations and studies performed so far support the feasibility of direct disposal of spent fuel in multipurpose casks as today used for transport and storage. Both additional concepts, BSK 3 and DIREGT, are expected to simplify disposal processes and to reduce operational risk without any compromise in long-term radiological safety aspects.
引用
收藏
页码:649 / 659
页数:11
相关论文
共 50 条
  • [31] HANDLING RADIOACTIVE-WASTES FROM NUCLEAR-POWER PLANTS AND REPROCESSING SPENT NUCLEAR-FUEL
    NIKIFOROV, AS
    ZHIKHAREV, MI
    ZEMLYANUKHIN, VI
    KULICHENKO, VV
    NAKHUTIN, IE
    POLYAKOV, AS
    RAKOV, NA
    SOVIET ATOMIC ENERGY, 1981, 50 (02): : 116 - 125
  • [32] Nuclear fuel cycle for Russian ship spent nuclear fuel: Reprocessing or direct disposal?
    Barskov, MK
    Gavrilov, SD
    Smirnov, PL
    Shcherbak, VP
    Yurasov, NN
    ANALYSIS OF RISKS ASSOCIATED WITH NUCLEAR SUBMARINE DECOMMISSIONING, DISMANTLING AND DISPOSAL, 1999, 24 : 303 - 311
  • [33] Nuclear waste transport! Dangers for us all through the transport of spent fuel from German nuclear energy plants
    Krauss, O
    RADIOLOGE, 1998, 38 (09): : 764 - 765
  • [34] No to spent fuel 'disposal'
    Peachey, Caroline
    NUCLEAR ENGINEERING INTERNATIONAL, 2012, 57 (695): : 5 - 5
  • [35] Spent fuel disposal
    Eriksson, Leif G.
    Radwaste Solutions, 2010, 17 (01): : 22 - 30
  • [36] Source term calculation of spent fuel assembly of PWR nuclear power plants
    China Nuclear Power Engineering Co. Ltd., Beijing 100840, China
    不详
    Yuanzineng Kexue Jishu, 2013, SUPPL1 (192-196):
  • [37] Seismic Evaluation Approaches for Spent Fuel Pool Structures in Nuclear Power Plants
    Hsu, Wei-Hung
    Chai, Juin-Fu
    Lin, Fan-Ru
    INTERNATIONAL JOURNAL OF STRUCTURAL STABILITY AND DYNAMICS, 2023, 23 (19)
  • [38] Investigative study of radiotoxicity of spent nuclear fuel assembly of some commercial nuclear power plants
    Ojo, Olanrewaju Peter
    Sogbadji, Robert
    Abrefah, Rex Gyeabour
    APPLIED RADIATION AND ISOTOPES, 2022, 190
  • [39] Technical Options and Cost Estimates for Spent Nuclear Fuel Management at the Barakah Nuclear Power Plants
    Esmail, Shadwan M. M.
    Cheong, Jae Hak
    SCIENCE AND TECHNOLOGY OF NUCLEAR INSTALLATIONS, 2021, 2021
  • [40] Seismic investigations for the final disposal of spent nuclear fuel in Finland
    Cosma, C
    Heikkinen, P
    JOURNAL OF APPLIED GEOPHYSICS, 1996, 35 (2-3) : 151 - 157