共 50 条
- [2] The Quay Crane Scheduling Problem with Time Windows [J]. NAVAL RESEARCH LOGISTICS, 2011, 58 (07) : 619 - 636
- [5] The Influence of the Quay Crane Traveling Time for the Quay Crane Scheduling Problem [J]. INTERNATIONAL MULTICONFERENCE OF ENGINEERS AND COMPUTER SCIENTIST, IMECS 2012, VOL II, 2012, : 1298 - 1301
- [7] A genetic algorithm heuristic for solving the quay crane scheduling problem with time windows [J]. Maritime Economics & Logistics, 2015, 17 : 515 - 537
- [10] A fast heuristic for quay crane scheduling with interference constraints [J]. Journal of Scheduling, 2009, 12 : 345 - 360