共 50 条
- [31] Optimization of Ship Scheduling Based on One-Way Fairway [J]. ALGORITHMS AND ARCHITECTURES FOR PARALLEL PROCESSING, ICA3PP 2014, PT II, 2014, 8631 : 479 - 486
- [32] Memetic algorithm for crane scheduling problem with spatial and temporal constraints [J]. Dongbei Daxue Xuebao/Journal of Northeastern University, 2014, 35 (02): : 190 - 194
- [33] Crane scheduling with time windows in circuit board production lines [J]. Int J Prod Res, 5 (1187):
- [36] A Proactive Approach for Simultaneous Berth and Quay Crane Scheduling Problem with Stochastic Handling Time [J]. CIE: 2009 INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, VOLS 1-3, 2009, : 74 - 79