Multiple Customers/Transporters Integrated Scheduling Problem to Minimize the Total Cost

被引:0
|
作者
Hammoudan, Z. [1 ]
Ahmed, F. S. [2 ]
Grunder, O. [1 ]
El-Moudni, A. [1 ]
机构
[1] UTBM, UBFC, IRTES SET, F-90010 Belfort, France
[2] Univ Lyon 1, Lab Automat & Genie Procedes, F-69622 Villeurbanne, France
来源
IFAC PAPERSONLINE | 2016年 / 49卷 / 12期
关键词
Integrated Scheduling; Delivery and Inventory; Multiple Customers; Branch and Bound; PRODUCTION-INVENTORY MODEL; SUPPLY CHAIN; FIXED-INTERVAL; SYSTEM;
D O I
10.1016/j.ifacol.2016.07.888
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In tires paper, Multiple Customers/Transport Integrated Scheduling Problem is presented and analyzed. The objective is to minimize the total cost i.e. the delivery and inventory costs over the entire supply chain. Two methods of resolution are then presented and compared. The first one is a dedicated branch and bound, and the second one is commercial solver based on a MIP formulation of the considered problem. Their performances have been evaluated by comparing the resolution time required by each method as the number of transporter, customers and jobs increase. The experimental results show that the Branch and Bound algorithm I. is much more efficient than CPIJA solver for this problem. (C) 2016, IFAC (International Federation of Automatic Control) Hosting by Elsevier Ltd. All right reserved.
引用
下载
收藏
页码:892 / 897
页数:6
相关论文
共 50 条
  • [31] Optimizing the Renovation Scheduling of Leased Residential Buildings to Minimize Total Project Cost
    AlOtaibi, Mansour
    El-Rayes, Khaled
    Altuwaim, Ayman
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2021, 147 (07)
  • [32] Scheduling jobs on unrelated parallel machines to minimize regular total cost functions
    Azizoglu, Meral
    Kirca, Omer
    IIE Transactions (Institute of Industrial Engineers), 1999, 31 (02): : 153 - 159
  • [33] Scheduling jobs on unrelated parallel machines to minimize regular total cost functions
    Azizoglu, M
    Kirca, O
    IIE TRANSACTIONS, 1999, 31 (02) : 153 - 159
  • [34] Serial-batching scheduling problem to minimize total weighted completion time
    Tian, Le
    Zhao, Chuan-Li
    Xi Tong Gong Cheng Yu Dian Zi Ji Shu/Systems Engineering and Electronics, 2007, 29 (11): : 1883 - 1885
  • [35] A stochastic approach for the single-machine scheduling problem to minimize total expected cost with client-dependent tardiness costs
    Ozcelik, Feristah
    Ertem, Mehmet
    Sarac, Tugba
    ENGINEERING OPTIMIZATION, 2022, 54 (07) : 1178 - 1192
  • [36] Scheduling orders for multiple product types to minimize total weighted completion time
    Leung, Joseph Y. -T.
    Li, Haibing
    Pinedo, Michael
    DISCRETE APPLIED MATHEMATICS, 2007, 155 (08) : 945 - 970
  • [37] Single-machine common due window assignment and scheduling to minimize the total cost
    Yin, Yunqiang
    Cheng, T. C. E.
    Wang, Jiayin
    Wu, Chin-Chia
    DISCRETE OPTIMIZATION, 2013, 10 (01) : 42 - 53
  • [38] Erratum to: Scheduling jobs on parallel machines to minimize a regular step total cost function
    Boris Detienne
    Stéphane Dauzère-Pérès
    Claude Yugma
    Journal of Scheduling, 2011, 14 (6) : 539 - 540
  • [39] Single-machine batch scheduling to minimize the total setup cost in the presence of deadlines
    Dominik Kress
    Maksim Barketau
    Erwin Pesch
    Journal of Scheduling, 2018, 21 : 595 - 606
  • [40] Manufacturing project scheduling considering human factors to minimize total cost and carbon footprints
    Rahman, Humyun Fuad
    Servranckx, Tom
    Chakrabortty, Ripon K.
    Vanhoucke, Mario
    El Sawah, Sondoss
    APPLIED SOFT COMPUTING, 2022, 131