Research on the Lightning Intruding Overvoltage and Protection Measures of 500 kV AC Fault Current Limiter

被引:5
|
作者
Chen, Changfu [1 ]
Han, Yongxia [1 ]
Liu, Junxiang [2 ]
Mo, Wenxiong [2 ]
Yuan, Zhao [3 ]
Huang, Jianning [1 ]
Su, Haibo [2 ]
Zhang, Xiancong [2 ]
Wu, Kaijian [3 ]
机构
[1] South China Univ Technol, Sch Elect Power, Guangzhou 510641, Guangdong, Peoples R China
[2] Guangzhou Power Supply Co Ltd, Test & Res Inst, Guangzhou 514010, Guangdong, Peoples R China
[3] Huazhong Univ Sci & Technol, Sch Elect & Elect Engn, Wuhan 430074, Hubei, Peoples R China
基金
国家重点研发计划;
关键词
fault current limiter; overvoltage; high coupled split reactor; shunt capacitor; lightning impulse withstand voltage; TOWER;
D O I
10.3390/en12203845
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
As one of the key technologies to solve the problem of high short-circuit current, the fault current limiter (FCL) has become a research hotspot in China and abroad. The overvoltage and protection measures of the FCL are the key technologies for its application. Therefore, this paper studies the lightning intruding overvoltage and protection measures for a 500 kV FCL based on a high coupled split reactor (HCSR). Firstly, according to the main topology of the system and the 500 kV HCSR-FCL structure, the lightning intruding overvoltage simulation model of the 500 kV station, including the nearby transmission lines, is established on the PSCAD (Power Systems Computer Aided Design) program. Secondly, the lightning overvoltage of the equipment in the station and the components of the HCSR-FCL are simulated and analyzed when the transmission lines nearby are subjected to lightning shielding failure and back flashover. Meanwhile, the influence of the HCSR-FCL on the lightning overvoltage of the equipment in the station are compared and analyzed before and after the HCSR-FCL is installed. The simulation results show that the overvoltage of the equipment in the station and the components of the HCSR-FCL is more serious when the shielding failure occurs in the transmission lines nearby. The HCSR-FCL can reduce the lightning overvoltage of the equipment in the station, but the maximum inter-terminal and inter-arm lightning overvoltage of the HCSR can reach 1064 kV and 790 kV, respectively, under the current limiting state and the current sharing state. Finally, methods of increasing the arresters on the transmission lines side of the HCSR-FCL and shunt capacitor between each module of the HCSR-FCL are proposed to reduce the lightning overvoltage. The lightning impulse withstand voltage of each component of the HCSR is also proposed: The inter-terminal lightning impulse withstand voltage of HCSR is 170 kV. The inter-arm lightning impulse withstand voltage of HCSR is 200 kV. The terminal-to-ground lightning impulse withstand voltage of the HCSR-FCL is 1550 kV.
引用
收藏
页数:17
相关论文
共 50 条
  • [1] Simulation on the Overvoltage of 500 kV Fault Current Limiter Based on Fault Current Capture Technology
    Zou, Lin
    Huang, Zhihui
    Wang, Song
    Li, Ruihai
    Zou, Jiyan
    2017 4TH INTERNATIONAL CONFERENCE ON ELECTRIC POWER EQUIPMENT-SWITCHING TECHNOLOGY (ICEPE-ST), 2017, : 505 - 508
  • [2] Voltage Distribution Analysis of High Coupled Split Reactor in 500 kV AC Fault Current Limiter
    Wu, Kaijian
    Yuan, Zhao
    Ye, Jingjing
    Liu, Junxiang
    Mo, Wenxiong
    Wang, Yong
    Chen, Lixue
    He, Junlei
    Pan, Yuan
    IEEE ACCESS, 2020, 8 : 185804 - 185815
  • [3] Fault Detection System for 500 kV AC Fault Current Limiter Based on High-Coupled Split Reactor
    Liu, Zhixiong
    Chen, Hongkun
    Hu, Zhuoran
    Li, Yizhang
    Wu, Xinjian
    Peng, Heping
    IEEE TRANSACTIONS ON APPLIED SUPERCONDUCTIVITY, 2021, 31 (08)
  • [4] TRANSIENT LIGHTNING OVERVOLTAGE PROTECTION REQUIREMENTS FOR A 500 KV GAS-INSULATED SUBSTATION
    CRONIN, JC
    COLCLASER, RG
    LEHMAN, RF
    IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1978, 97 (01): : 68 - 78
  • [5] Observation of Lightning Overvoltage in a 500 kV Switching Station
    Sonoda, Toshio
    Morii, Hiroshi
    Sekioka, Shozo
    IEEE TRANSACTIONS ON POWER DELIVERY, 2017, 32 (04) : 1828 - 1834
  • [6] Analysis on lightning overvoltage of 500kV substation
    Shao Yu
    Shao Ming
    Shi Feng
    Wang Kun
    MECHATRONICS, ROBOTICS AND AUTOMATION, PTS 1-3, 2013, 373-375 : 1541 - 1545
  • [7] Dynamic Simulation of the Overvoltage for Fault Current Limiter
    Yang, Zhiping
    Chen, Hongkun
    Jin, Qingren
    Zheng, Dongfang
    Liu, Tao
    Bu, Wenfeng
    2011 ASIA-PACIFIC POWER AND ENERGY ENGINEERING CONFERENCE (APPEEC), 2011,
  • [8] Study on the lightning overvoltage protection of a 500kV unified power flow controller station
    Ding, Ting
    Tao, Fengbo
    He, Hengxin
    Zhong, Jiqun
    He, Junjia
    He, Huiwen
    JOURNAL OF ENGINEERING-JOE, 2019, (16): : 1100 - 1106
  • [9] Winding Technology and Experimental Study on 500 kV Superconductive Fault Current Limiter
    Liang, Chen
    Li, Chao
    Zhang, Pingxiang
    Song, Meng
    Ma, Tao
    Zhou, Tao
    Ge, Zhengfu
    IEEE TRANSACTIONS ON APPLIED SUPERCONDUCTIVITY, 2018, 28 (03)
  • [10] Cooling Unit for the 500 kV Saturated Iron Core Fault Current Limiter
    Li, Chao
    Zhang, Pingxiang
    Wang, Dayou
    Song, Meng
    Ma, Tao
    Ma, Peng
    Ge, Zhengfu
    IEEE TRANSACTIONS ON APPLIED SUPERCONDUCTIVITY, 2019, 29 (05)