Solving the Negative Earnings Dilemma of Multistage Bidding in Public Construction and Infrastructure Projects: A Game Theory Based Approach

被引:13
|
作者
Ahmed, Muaz O. [1 ]
El-adaway, Islam H. [2 ,3 ,4 ]
Coatney, Kalyn T. [5 ]
机构
[1] Missouri Univ Sci & Technol, Dept Civil Architectural & Environm Engn, 326 Butler Carlton Hall,1401 N Pine St, Rolla, MO 65401 USA
[2] Missouri Univ Sci & Technol, Dept Engn Management & Syst Engn, Dept Civil Architectural & Environm Engn, Construct Engn & Management, 326 Butler Carlton Hall,1401 N Pine St, Rolla, MO 65401 USA
[3] Missouri Univ Sci & Technol, Dept Engn Management & Syst Engn, Dept Civil Architectural & Environm Engn, Civil Engn, 326 Butler Carlton Hall,1401 N Pine St, Rolla, MO 65401 USA
[4] Missouri Univ Sci & Technol, Dept Engn Management & Syst Engn, Dept Civil Architectural & Environm Engn, Missouri Consortium Construct Innovat, 326 Butler Carlton Hall,1401 N Pine St, Rolla, MO 65401 USA
[5] Mississippi State Univ, Dept Agr Econ, 365 Lloyd Ricks Watson Bldg,East Wing,Box 5187, Mississippi State, MS 39762 USA
关键词
AUCTIONS; STRATEGY; !text type='PYTHON']PYTHON[!/text;
D O I
10.1061/(ASCE)ME.1943-5479.0000997
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
With the tremendous increase in spending on public projects, contractors need to employ efficient and effective bidding strategies to cope with the competitive bidding environment. Usually, general contractors carry a portion of the work and subcontract other parts to eventually submit a holistic joint bid. This bidding setting is referred to as multistage bidding where subcontractors submit their quotations/ bids to the general contractor, after which the general contractor submits a final joint bid for the whole project. In a multistage bidding environment, general contractors may be faced with an increase in the probability of negative or below normal profits. Despite previous research efforts for developing bidding models, there is a need for the extension of existing literature to tackle the multistage bidding environment, referred to hereinafter as multistage game (MSG). As such, the goal of this paper is to develop a bidding model for the MSG. The authors followed a multistep research methodology comprised of: (1) defining MSG in terms of game theory; (2) deriving a game-theoretic bid function for general contractors to determine the final joint bid to submit in MSG; and (3) developing a simulation model for MSG, using a data from 2,235 US public infrastructure projects. Results demonstrate that the new bid function gives general contractors a competitive advantage by avoiding the occurrence of negative profits in their part of the project. Also, results show a reduction in the occurrence and magnitude of the negative profits in relation to the final joint bids. This research significantly contributes to the body of knowledge by providing an innovative bid function for MSG. In addition, it offers substantial practical benefits for general contractors by providing a tool that facilitates dealing with the inherent complexity and uncertainties related to actual cost estimation within the MSG decision-making process. (C) 2021 American Society of Civil Engineers.
引用
收藏
页数:19
相关论文
共 39 条
  • [21] EVOLUTIONARY GAME ANALYSIS FOR RENT-SEEKING BEHAVIOR SUPERVISION OF MAJOR INFRASTRUCTURE PROJECTS BASED ON PROSPECT THEORY
    Lv, Lelin
    Li, Huimin
    Wang, Zhuofu
    Zhang, Chengyi
    Qiao, Ran
    [J]. JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2022, 28 (01) : 6 - 24
  • [22] Public participation in infrastructure and construction projects in China: From an EIA-based to a whole-cycle process
    Li, Terry H. Y.
    Ng, S. Thomas
    Skitmore, Martin
    [J]. HABITAT INTERNATIONAL, 2012, 36 (01) : 47 - 56
  • [23] Network Theory-Based Approach to Data-Driven Assessment of Bidding Competition in Highway Construction
    Moriyani, Muhammad Ali
    Asaye, Lemlem
    Le, Chau
    Le, Tuyen
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2024, 40 (01)
  • [24] A game theory approach for the renegotiation of Public-Private Partnership projects in Chinese environmental and urban governance industry
    Liang, Qingxue
    Hu, Hao
    Wang, Zhaojing
    Hou, Feng
    [J]. JOURNAL OF CLEANER PRODUCTION, 2019, 238
  • [25] An XML-based budgeting approach for public construction projects: A case study from Kuwait
    Alrasheed, Khaled A.
    Albader, Haya B.
    [J]. KUWAIT JOURNAL OF SCIENCE & ENGINEERING, 2011, 38 (1B): : 37 - 53
  • [26] Cooperative game theory approach towards capital equipment procurement in construction projects: a concrete batch plant case study
    Rouhparvar, Mahdi
    Babaei, Fatemeh
    Navidi, Hamidreza
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2024,
  • [27] Developing a new model for simultaneous scheduling of two grand projects based on game theory and solving the model with Benders decomposition
    Piri, Loghman
    Ghezavati, Vahidreza
    Hafezalkotob, Ashkan
    [J]. FRONTIERS OF ENGINEERING MANAGEMENT, 2022, 9 (01) : 117 - 134
  • [28] Developing a new model for simultaneous scheduling of two grand projects based on game theory and solving the model with Benders decomposition
    Loghman PIRI
    Vahidreza GHEZAVATI
    Ashkan HAFEZALKOTOB
    [J]. Frontiers of Engineering Management, 2022, (01) : 117 - 134
  • [29] Developing a new model for simultaneous scheduling of two grand projects based on game theory and solving the model with Benders decomposition
    Loghman Piri
    Vahidreza Ghezavati
    Ashkan Hafezalkotob
    [J]. Frontiers of Engineering Management, 2022, 9 : 117 - 134
  • [30] Fuzzy Integral-Based Risk-Assessment Approach for Public-Private Partnership Infrastructure Projects
    Mazher, Khwaja Mateen
    Chan, Albert P. C.
    Zahoor, Hafiz
    Khan, Mohsen Islam
    Ameyaw, Ernest Effah
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2018, 144 (12)