Developing a new model for simultaneous scheduling of two grand projects based on game theory and solving the model with Benders decomposition

被引:0
|
作者
Loghman Piri
Vahidreza Ghezavati
Ashkan Hafezalkotob
机构
[1] Islamic Azad University,School of Industrial Engineering
[2] South Tehran Branch,undefined
来源
关键词
project scheduling; resource leveling between projects; constrained resources; game theory; Benders decomposition;
D O I
暂无
中图分类号
学科分类号
摘要
Grand infrastructure projects, such as dam, power plant, petroleum, and gas industry projects, have several contractors working on them in several independent sub-projects. The concern of reducing the duration of these projects is one of the important issues among various aspects; thus, our aim is to fulfill the requirements by using the game theory approach. In this study, a mixed-integer programming model consisting of game theory and project scheduling is developed to reduce the duration of projects with a minimum increase in costs. In this model, two contractors in successive periods are entered into a step-by-step competition by the employer during dynamic games, considering an exchange in their limited resources. The optimum solution of the game in each stage are selected as the strategy, and the resources during the game are considered to be renewable and limited. The strategy of each contractor can be described as follows: 1) share their resources with the other contractor and 2) not share the resources with the other contractor. This model can act dynamically in all circumstances during project implementation. If a player chooses a non-optimum strategy, then this strategy can immediately update itself at the succeeding time period. The proposed model is solved using the exact Benders decomposition method, which is coded in GAMS software. The results suggest the implementation of four step-by-step games between the contractors. Then, the results of our model are compared with those of the conventional models. The projects’ duration in our model is reduced by 22.2%. The nominal revenue of both contractors has also reached a significant value of 46078 units compared with the relative value of zero units in the original model. Moreover, we observed in both projects the decreases of 19.5%, 20.9%, and 19.7% in the total stagnation of resources of types 1, 2, and 3, respectively.
引用
收藏
页码:117 / 134
页数:17
相关论文
共 45 条
  • [1] Developing a new model for simultaneous scheduling of two grand projects based on game theory and solving the model with Benders decomposition
    Piri, Loghman
    Ghezavati, Vahidreza
    Hafezalkotob, Ashkan
    [J]. FRONTIERS OF ENGINEERING MANAGEMENT, 2022, 9 (01) : 117 - 134
  • [2] Developing a new model for simultaneous scheduling of two grand projects based on game theory and solving the model with Benders decomposition
    Loghman PIRI
    Vahidreza GHEZAVATI
    Ashkan HAFEZALKOTOB
    [J]. Frontiers of Engineering Management, 2022, (01) : 117 - 134
  • [3] Three-based level model to determine optimal scheduling of the MG integrated operation using Benders decomposition
    Kouhian, Farhad
    Zangeneh, Ali
    Marti, Jose Ramon
    [J]. IET GENERATION TRANSMISSION & DISTRIBUTION, 2019, 13 (20) : 4712 - 4723
  • [4] Distributed joint dynamic maintenance and production scheduling in manufacturing systems: Framework based on model predictive control and Benders decomposition
    Rokhforoz, Pegah
    Fink, Olga
    [J]. JOURNAL OF MANUFACTURING SYSTEMS, 2021, 59 : 596 - 606
  • [5] Developing an integrated land allocation model based on linear programming and game theory
    Hasti, Farzam
    Salmanmahiny, Abdolrassoul
    Rouhi, Haydar
    Sakieh, Yousef
    Joolaei, Ramtin
    Pezhooli, Negin
    [J]. ENVIRONMENTAL MONITORING AND ASSESSMENT, 2023, 195 (04)
  • [6] Developing an integrated land allocation model based on linear programming and game theory
    Farzam Hasti
    Abdolrassoul Salmanmahiny
    Haydar Rouhi
    Yousef Sakieh
    Ramtin Joolaei
    Negin Pezhooli
    [J]. Environmental Monitoring and Assessment, 2023, 195
  • [7] A Two-Dimensional Model for Game Theory Based Predictive Analytics
    Karimi, Mirhossein Mousavi
    Rahimi, Shahram
    [J]. 2021 INTERNATIONAL CONFERENCE ON COMPUTATIONAL SCIENCE AND COMPUTATIONAL INTELLIGENCE (CSCI 2021), 2021, : 510 - 515
  • [8] A Game Theory Based Resource Scheduling Model for Cost Reduction in Home Health Care
    Xie, Z.
    Sharath, N.
    Wang, C.
    [J]. 2015 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2015, : 1800 - 1804
  • [9] On Developing the Learning Game for Graph Theory A new design model considering the learners' reflexiveness
    Yang, Meng-Chien
    Xu, Zi-Ting
    Hsu, Lih-Hsing
    [J]. PROCEEDINGS 2016 5TH IIAI INTERNATIONAL CONGRESS ON ADVANCED APPLIED INFORMATICS IIAI-AAI 2016, 2016, : 418 - 422
  • [10] A benders-decomposition-based transient-stability-constrained unit scheduling model utilizing cutset energy function method
    Saberi, Hossein
    Amraee, Turaj
    Zhang, Cuo
    Dong, Zhao Yang
    [J]. INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2021, 124