FLEXIBLE APPROACH FOR CONSTRUCTION PROCESS MANAGEMENT UNDER RISK AND UNCERTAINTY

被引:5
|
作者
Paslawski, Jerzy [1 ]
机构
[1] Inst Stuct Engn, 5 Piotrowo Str, PL-60965 Poznan, Poland
关键词
flexibility; options; flexibility enablers; risk; uncertainty; FLEXIBILITY; INFRASTRUCTURE; PERFORMANCE; NETWORKS; OPTIONS; DESIGN;
D O I
10.1016/j.proeng.2017.11.028
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This article presents the basic conditions for the application of a flexible approach to the management of construction processes, resulting primarily from high levels of risk and uncertainty. On the one hand, for simple projects whose implementation is not exposed to dynamically changing environments, the use of flexibility is not justified; on the other hand, in the case of complex, innovative projects implemented in a turbulently variable environment, flexibility gives the opportunity to continue processes despite difficulties. Flexibility can be successfully applied at different levels of management and at different phases of the life cycle of a building. Different flexibility options have been presented based on the approach to real options. A procedure for implementing flexibility in building management was proposed. The flexible approach is illustrated by examples of its use. (C) 2017 The Authors. Published by Elsevier Ltd.
引用
收藏
页码:114 / 124
页数:11
相关论文
共 50 条
  • [32] Optimal Management of Groundwater Under Uncertainty: A Unified Approach
    Krishnamurthy, Chandra Kiran B.
    ENVIRONMENTAL & RESOURCE ECONOMICS, 2017, 67 (02): : 351 - 377
  • [33] INFRASTRUCTURE MANAGEMENT UNDER UNCERTAINTY - LATENT PERFORMANCE APPROACH
    BENAKIVA, M
    HUMPLICK, F
    MADANAT, S
    RAMASWAMY, R
    JOURNAL OF TRANSPORTATION ENGINEERING-ASCE, 1993, 119 (01): : 43 - 58
  • [34] Optimal Management of Groundwater Under Uncertainty: A Unified Approach
    Chandra Kiran B. Krishnamurthy
    Environmental and Resource Economics, 2017, 67 : 351 - 377
  • [35] Project management under uncertainty: using flexible resource management to exploit schedule flexibility
    Faria, Joao
    Araujo, Madalena
    Demeulemeester, Erik
    Tereso, Anabela
    EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2020, 14 (05) : 599 - 631
  • [36] Flexible and risk-sharing supply contracts under price uncertainty
    Li, CL
    Kouvelis, P
    MANAGEMENT SCIENCE, 1999, 45 (10) : 1378 - 1398
  • [37] ADVANTAGE TO A RISK NEUTRAL FIRM OF FLEXIBLE RESOURCES UNDER DEMAND UNCERTAINTY
    SCOTT, RC
    HIGHFILL, JK
    SATTLER, EL
    SOUTHERN ECONOMIC JOURNAL, 1988, 54 (04) : 934 - 949
  • [38] A backoff approach to design of optimally flexible water networks under uncertainty
    Moghaddam, Amir M. Fathi
    Sahlodin, Ali M.
    Sarrafzadeh, Mohammad-Hossein
    JOURNAL OF CLEANER PRODUCTION, 2022, 371
  • [39] Scenario-based approach for flexible resource loading under uncertainty
    Wullink, G
    Gademann, AJRM
    Hans, EW
    Van Harten, A
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2004, 42 (24) : 5079 - 5098
  • [40] A Genetic Approach to Green Flexible Job Shop Problem Under Uncertainty
    Afsar, Sezin
    Puente, Jorge
    Palacios, Juan Jose
    Gonzalez-Rodriguez, Ines
    Vela, Camino R.
    BIOINSPIRED SYSTEMS FOR TRANSLATIONAL APPLICATIONS: FROM ROBOTICS TO SOCIAL ENGINEERING, PT II, IWINAC 2024, 2024, 14675 : 183 - 192